NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
Mercury/CVAFS Initial Calibration: % RSD< 15 or r^ > Perform
prior to sample 0.999; percent recovery necessary
analysis of each standard in equipment
curve 90-110% when maintenance
calculated with curve and check
with the exception of calibration
the lowest standards
concentration standard
which must be 75-
125%_____________
Initial Calibration 90-110% of true value
Verification:
immediately after
initial calibration
Continuing 90-110% of true value
Calibration
Verification: every
10 samples or
every 12 hours,
whichever is more
frequent and at end
of analytical
sequence
Dioxins & Initial Calibration: % RSD of RRFs must Perform
Furans/HRGC/HRMS prior to sample be <10 for unlabeled necessary
analysis; once standards; % RSD of equipment
every 6 months of RRFs must be < 20 for maintenance
whenever indicated labeled standards. S.N and check
by continuing ratio must be > 10:1 for calibration
calibration labeled standards and standards
>5:1 for unlabeled
standards.
Table 13-4a. Summary of Calibration Procedures for Fixed Laboratory Analyses
Parameter Frequency of Acceptance Corrective Action
Instrument Calibration Criteria
Continuing RRFs must be
Calibration within ± 20% of
Verification (BCS initial calibration
3): beginning and mean RRF for
end of each 12 hour unlabeled standards
shift or batch, and ± 30% for
whichever is smaller labeled standards;
verify GC column
96
CITY_21MC100_003237500
NYC-WTC_000447529