EM 1110-2-3800
1 Mar 72
c. One way of simplifying the handling of weathered material is to
blast and excavate it in one or two lifts apart from material below. By
partially excavating down to the lower limit of a weathered zone, the
mass is simplified to one with uniform properties. Because of the de
creased seismic velocity, upper lifts might respond to lower velocity
explosives for best impedance matching and efficiency. In the transi
tion zones and in the fresh rock below, detonation velocity might be
increased farther.
d. Some weathered rocks are so decomposed that they can be
treated as soil and excavated without blasting. A seismic velocity of
about 4,000 fps is a routinely accepted upper limit for rock that can be
loosened by ripping without blasting. With improvements in ripper de
sign and techniques, material with seismic velocities as great as
7,000 fps can be ripped. However, there are other factors that may be
involved in determining whether rock can be ripped economically.
e. In a few special types of weathering, the lower portion of the
zone has material characterized by a greater strength, as in laterite
and caliche.
6 - 6. Groundwater.
a. Zones of various degrees of saturation by groundwater form
another type of crude stratification parallel to the ground surface, with
properties varying accordingly. Sa^rated zones require explosives
with greater water resistances and necessitate more care in stemming.
Important distinctions must be made in the properties of the materials
and the results to be expected. The filling of void space by water tends
to increase the P-wave velocity in the mass and improves wave trans
mission. The coupling between the explosive and the rock is also
improved.
b. Unsaturated material above the water table should be blasted
separately from that in the capillary zone and below where reasonable.
After removal of the unsaturated material, however, it should be veri
fied that the material yet to be excavated is still saturated. Disturbance
during excavation may have caused groundwater to migrate. Fluctua
tions from rainy to dry seasons should be considered also.
c. The results of blasting during removal of the unsaturated zones
should be carefully evaluated for guidance in the blasting below the
water table. Where these previous results are considered satisfactory,
modifications might consist of the use of explosives with a higher deto
nation velocity for better coupling to the saturated rock, and/or the use
of smaller loads and wider hole spacings.
6-16