NYC 9/11 Public Portal Document
EM 1110-2-3800
1 Mar 72
of dynamite per foot of hole; however, lighter loads would probably be
better in weak rock masses. Stemming consisting of 3/8-in. clean
stone chips or fine gravel should be poured around the charges and
should fill the top 3 to 4 ft of hole. Fig. 5-19 illustrates presplit blast
holes loaded and ready for firing. The detonating cord down lines
from each hole are tied to a trunk line. The trunk line leads at each
end to electric blasting caps.^^
r
Kt/2 T0 4rr (USUALLY 2 PT)
SO-GRAIN detonating CORO TRUNK CINE
STEMMING
------ -SO-GRAIN DETONATING
CORO DOWN LINE
1.1/4 X 4.IN. STICKS OF
40% GELATIN OR AMMONIA
GELATIN DYNAMITE
(THREADED OR TAPED TO
DETONATING CORD DOWN
LINE)
-3/8-IN. CLEAN STONE CHIPS
OR GRAVEL. STEMMING
’ r •—TWO 1-1/4 K 4-IN. STICKS OF
40% gelatin or ammonia
GELATIN DYNAMITE
2-1/2 TO J-J/2 IN. fUSUALLY 3 IN.)
Fig. 5-19. Section of typical presplit holes ready for firing
5-18
CITY_21MC100_0 12669689
NYC-WTC_000435919
OCR can misread numbers and units. Confirm readings against the page image before using them.