sequence, starting at the top. High quarry faces (75 ft and more) have
been successfully blasted using a combination of snake holes and verti
cal holes. Lifters and snake holes are not commonly employed in
structural excavation as their use generally requires that previously
blasted rock be excavated before drilling can commence for subsequei>t
rounds. Snake holes may produce excessive flyrock, and if they are
drilled on an incline to below the final grade-line tolerance, the final
rock surface is damaged.
(4) Varying the Hole Array to Fit Natural and Excavation
Topography.
(a) Benches may be designed and carried forth with more than
one face so that simple blasting patterns can be used to remove the
rock. Fig. 5-9 shows a typical bench cut to two free faces and fired
with one delay per row. The direction of throw of the blasted rock can
be controlled by varying the delay pattern (Fig. 5-9a). The rock will
(
II /
I /
I £DGE OFI BENCH I EDGE OF / BENCH /
2
/
2
3
4
(a) (b)
Fig. 5-9. Varying the direction of throw (arrows) by
arrangement of delays (numbers)
move forward normal to the rows of holes. If the holes were fired in
oblique rows (Fig. 5-9b) from right to left, however, the rock mass
would be thrown to the right during blasting.
(b) The relations of delay systems to the drill-hole pattern should
be considered an integral part of the blast pattern. Because of the
change in direction of free faces toward which the rows will fire, the
burden is decreased and spacing increased and the pattern is changed
from square to staggered.