(c) Excavations can be opened by plow or deep “V” cuts where an
initial cut is lacking. The cut is then enlarged in one of several bench
levels. Fig. 5-10 shows a multiple-row round designed to open an exca-
vation such as a foundation, wide
bench, or road cut. Fig. 5-11
shows an elongated quarry blast
pattern opened in the center and
progressing toward each end by
means of delays. This method
may be used in deep through SLOPE2:1
cuts 100 to 300 ft wide at the
top. Where the cut becomes
narrow, it may be worked from
the center row outward toward
the sides, as shown in Fig. 5-12.
I 1
(d) The depth of each lift or
I
1
bench is usually about 10 to 30 ft I,
with shallower depths consider 4 3 2 1 2 7 B 9 10 1 1 12 13
ably more efficient. With large
or inclined holes the benches may I' '
be 50 ft or more in height but this
should not be considered in
structural excavation. Bench
heights in cuts through hilly topog
1
\V—LIMIT OF ROUND^
il
raphy change continuously and
(Courtesy of AlmQvist & Wiksell Forlag AB)
burden and spacing must be modi
fied accordingly. In Fig. 5-13 all
holes bottom near the lower limit Fig. 5-10. Multiple-row round
of intended breakage, but spacing, including a V-cut opening. Rock
burden, and hole depth increase in delay areas 1-4 is removed
uphill to comply with the irregu first to establish the free face
lar ground surface. (after Langefors and Kihlstrom^^)
FIKED « MILLISECONDS APAHT SIMULTANEOUSLY
Copyrtgltt 1969 by McGrauj~Hill, Inc. (Engineering
and Uining Journal, November 1964)
Fig. 5-11. Large quarry blast pattern measuring 600 by 100 by 48 ft.
Illustrates how a single round accomplished what normally was done
in 15 shots^^
5-9