Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
EM 1110-2-3800
1 Mar 72
considerable percentage of rock “wasted” in order to obtain required
gradation. Allowance for this should be made when estimating quanti
ties of rock necessary to produce the desired product.
1. Vibration and Damage Control. See EM 385-1-1.
FOR THE CHIEF OF ENGINEERS:
RICHARD F. McADOO
Colonel, Corps of Engineers
Executive
2 Appendixes
APP A - References
B - Typical CE Blasting Specifications
8-7
CITY_21MC100_012669738
NYC-WTC_000435968
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000435968Source: NYC Law Department, mirrored locally
Draft contract statement of work for implementing indoor dust sampling to analyze contaminants like asbestos and dioxin at the World Trade Center site.