NYC 9/11 Public Portal Document
EM 1110-2-3800
1 Mar 7 2
- CHAPTER 1. INTRODUCTION
1-1. Purpose. This manual describes reliable or preferred procedures
or concepts of drilling and blasting conducted during rock excavation,
in order to aid design and construction personnel in related matters
(para 1-4). Drilling and blasting methods described herein are not to be
regarded as official Corps of Engineers (CE) policy, but they should
be of assistance to CE personnel in establishing policy. The manual
is designed principally for the use of geologists and engineers who
are given responsibilities in drilling and blasting projects. Such re
sponsibilities may come either in the design or in the construction
phase.
1-2. Applicability. The provisions of this manual are applicable to
CE Divisions and Districts concerned with Civil Works design and
construction.
1-3. Refferences.
a. Department of the Army publications on related subjects are
listed below:
(1) ER 1110-2-1200 Plans and Specifications
(2) EM 385-1-1 General Safety Requirements
(3) EM 1110-1-1801 Geological Investigations
(4) EM 1110-1-1806 Presenting Subsurface Information
in Contract Plans and
Specifications
(5) EP 415-1-261 Construction Inspectors Guide
(6) TM 5-332 Pits and Quarries
b. Strict adherence to safety precautions in blasting is of ut
most importance. Publications specifically on safety in blasting
include:
Handbook of Electric Blasting Atlas Chemical Industries,
Inc., Explosives Division
Manufacture. Storage, Trans National Fire Protection
portation and Use of Explo Assoc.
sives and Blasting Agents,
1968 Rev Ed.
The following are obtainable from Institute of Makers of Explosives,
420 Lexington Ave., New York, N. Y. 10017
1-1
CITY_21MC100_0 12669624
NYC-WTC_000435854
OCR can misread numbers and units. Confirm readings against the page image before using them.