Lab report memo requesting FEMA funds to cover washdown/cleaning of AMEX Building, 200 Vesey, Jun 2002.
1 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗CTS I monitoring log and summary for asbestos removal at 44 Wall Street Basement B.
NYC-WTC_000390468
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
F Sts CONSLITIMG ilFSTWC SQMC». INC.
November 5, 2001
Mr. Ronald Fortuna Building Manager CUSHMAN & WAKEFIELD, INC. 44 Wall Street New York, NY 10005
RE: ASBESOT PROJECT MONITORING SERVICES PERFORMED AT 44 WALL STREET, BASEMENT ‘B’ LEVEL, NEW YORK, NEW YORK
Dear Mr. Fortuna:
On October 1^ and 2“**, 2001, Consulting & Testing Services, Inc. performed project monitoring for the above referenced location. Degmor, asbestos contractor, removed approximately 600 SF of VAT (vinyl asbestos tile).
Air monitoring was conducted by CTSI. Air samples were collected during all phases of the project and analyzed using Phase Contrast Microscopy (PCM) method. Clearance air samples taken passed clearance criteria per applicable regulations (<0.01 f/cc).
The project was completed successfully. All applicable Federal, State and Local Rules and Regulations were strictly enforced during removal.
Enclosed please find CTSI's daily log forms and PCM certificate of analysis.
If you have any questions or need further clarification, please do not hesitate to contact our office.
Sincerely,
CONSULTING^^^TINGS^VI^ INC.
Farhood Salami Project Executive
Encl.
01\report'\asbestos'*ir\rnisc\cush 44wanst-bsmt-ny421 -01
622 Georges Road, Suite 301 North Brunswick, NJ 08902 Tel.- (212) 929-34SI or (732) 729-1800 ENVIRONMENTAL, SAFETY & HEALTH PROFESSIONALS Fax; (732) 729-1803
CITY_21MC100_000621314 NYC-WTC_000390468
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000421064
Lab report memo requesting FEMA funds to cover washdown/cleaning of AMEX Building, 200 Vesey, Jun 2002.
1 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000417428
Internal memorandum documenting project details and communications between parties.
1 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000416719
Request for FEMA funding review to finance cleaning of AMEX Building (200 Vesey).
1 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000417343
DEP program file responding to 4/15/02 notice for 120 Wall Street; advisory note.
1 shared non-person entities · 1 shared topics · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112085
Final report from GPS Environmental Consultants confirming the World Financial Center North Tower is cleared for re-occupancy following asbestos cleanup.
1 shared non-person entities · 1 shared topics · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097285
Summary of 94,014 asbestos samples collected and analyzed at 225 Liberty Street between September 2001 and January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128041
Application for roof work at 143 Fulton Street submitted by Benjamin Kurzban & Son Control Inc.
1 shared non-person entities · 1 shared topics · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126772
NYC DEP permit application form submitted by building owners at 100 Church Street for environmental hazard abatement activities.
1 shared non-person entities · 1 shared topics · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128927
Invoice for debris removal services at 120 Fulton Street issued by Kurzban & Son Control, Inc. to the DEP in 2002.
1 shared non-person entities · 1 shared topics · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112013
Inspection form recording facade conditions and debris at the World Financial Center site.
1 shared non-person entities · 1 shared topics · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.897
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000132947
Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 correspondence acknowledging receipt of a four-part revised environmental work plan for 133-135 Greenwich Street.
Similarity score 0.944 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
Environmental consultant work plan detailing asbestos abatement and demolition procedures for 133-135 Greenwich Street and 21-23 Thames Street.
Similarity score 0.944 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127730
Cover letter submitting a documented approach for the deconstruction of buildings at 133-135 Greenwich Street and 21-23 Thames Street.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108941
Page from a DEP lab report file for 200 Water Street containing unreadable text and symbols.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119373
Correspondence regarding emergency cleanup at 125 Barclay Street dated November 21, 2001.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000112085
Final report from GPS Environmental Consultants confirming the World Financial Center North Tower is cleared for re-occupancy following asbestos cleanup.
Similar indexed content
NYC-WTC_000421064
Lab report memo requesting FEMA funds to cover washdown/cleaning of AMEX Building, 200 Vesey, Jun 2002.
Similar indexed content
NYC-WTC_000417428
Internal memorandum documenting project details and communications between parties.
Similar indexed content
NYC-WTC_000416719
Request for FEMA funding review to finance cleaning of AMEX Building (200 Vesey).
Similar indexed content
NYC-WTC_000097285
Summary of 94,014 asbestos samples collected and analyzed at 225 Liberty Street between September 2001 and January 2002.