Airtek Project 05-0701— August 11, 2005
We proposed to use Attachment E - Procedures for use of Foam or Similar Viscous
Liquid in Removal of Asbestos Containing Roofing (ACRM) in New York City,
4IM
In-place ACM has been identified as follows: to o6c 41 on_~ 1- o
r ,rc~xi toms se)r Qor}L.
1. Bulkhead Tar —10 sf Y-' P.R
2. Roof Flashing — 35 sf e fp ~rrar`5
r ► a cl4.
x0.1
b ta r
These materials will be abated last in the decontamination sequence. For detailed a} 4 5.
information on the asbestos survey conducted, please refer to the Airtek Asbestos o4 & cormmi C.
Survey Report dated May 31, 2005 (Attached). F'; C n C e
u { }kQ zorA
Utilities - General:
Utility service is currently cut off to the building. All electricity and water required for
the work will be drawn from sources outside the building.
Project Monitoring:
Project Monitoring: Throughout the decontamination activities, project air monitoring
will be conducted in addition to the Perimeter Monitoring described above. Project
Monitoring will be conducted in strict accordnce with RCNY Title 15 Chapter 1,
Section 1-41 to 1-45 with the oxeeptionthat 1l sample analys will by TEM.
~c c '~ve(i Variance a?eIImvfon
Clearance Testing: Aggressive area clearance testing for asbestos will be conducted for
all work areas by TEM. by
MOSH 7300
Clearance Criteria:
Clearance testing for asbestos will be acceptable when all samples for a given work area
meet the 70 structures per square millimeter TEM standard. C 1s
Antimon 250 ug/m3 i opc o )-f c nc e
Bari 250 ug/m3 sa.tti,.4 I; n -ZktU bey
B llium 1.0 ug/m3 (Ls Sf te.i as I n -4h¢. lOor-1 ?LOA.
Cadn1iun 5.0 ug/m3
Chromium 250 ug/m3
Copper SO0 ug/m3
Lead 2 ug/m3
Manganese 00 ug/m3
Mercury 12.5 ug/m3
Nickel 50 ug/m3
Zinc 1,000 ug/m3