NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

FEMA project narrative, PS 89 IS 89

Machine-extracted title · confidence 28%

Narrative summary of air-monitoring stations and per-day tests for PS 89.

NYC-WTC_000385806–000385807
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Parameter J^arget Level < Agency or Organization Temperature (T) Summer: 73-79 degrees at 50% RH AETllUAE 55 I Winter: 68-75 degrees at 50% RH j Relative Humidity (RH) ■“l(U60% t^HR.AE 55 Carbon Dioxide |'CO2) <700 parts per million (ppm) above j ASHRAE 62 background level i Carbon Monoxide 9 ppm ■ USEPA NPAAQS (as sitedmKSHRZMW f________________ 62) Total Volatile Organic Compounds 1 ppm AIHA (TVOC) Respirable Particulates (PM 25) 65 micrograms per cubic meter of air USEPA NPAAQS-G i [ for general population; 40 micrograms per cubic meter of air USEPA I which is recommended for sensitive individuals and children j

USEPA= United States Environmental Protection Agency NPAAQS= National Primary Ambient-Air Quality Standard AIHA= American Industrial Hygiene Association ASHRAE = American Society of Heating, Refrigerating, and Air Conditioning Engineers

Contract Costs

The total contract cost from March 1, 2002 to June 30, 2002 (the end of the school year) is estimated to be $156,856.62. A ' letter of explanation from the vendor and specific information pertaining to the ambient air sampling completed at PS 89 is attached to this PV/. The following information from the applicant and the applicant’s vendor was used to compute the total eligible cost:

The eligible costs incurred from March 1, 2002 to June 30, 2002 (122 days) = $156,856.62

$9,000 / 7 days = $1,285.71 per day $1,285.72 X 122 days= $156,856.62

Percentage of Work Completed

The percentage of work complete was calculated through May 6, 2002. As such, for 67 days of the 122 day period, the work perfomied by ATC Associates has been completed. The BoE has not been invoiced for these costs, and therefore the dollar amount in this PW is based on an estimate provided by the applicant’s vendor, ATC Associates.

67 days/ 122 day period = 67/122 = 55% of the work complete.

Prepared By: Matt Talley, Project Officer (BACK), .Sep 98

CITY_21MC100_009214643

NYC-WTC_000385807

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000385807Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →