NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

FEMA project worksheet, BOE air monitoring, 2002

Machine-extracted title · confidence 46%

FEMA worksheet for air-monitoring at BOE school PS 894, NY.

NYC-WTC_000324193–000324194
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I

Parameter ____________________JTarg^evel J___________ Agency or OrgaiiDiitinii Temperature (T) Summer: 73-79 degrees at 50% RH ASHRAE 55 Winter: 68-75 degrees at 50% RH Relative Humidity (RH) ■ 30-60% ASHRAE 55 Carbon Dioxide (CO2) <700 parts per million (ppm) above ASHRAE 62 background level Carbon Monoxide 9 ppm USEPA NPAAQS (as sited m ASHRAE 62) ___________________ Total Volatile Organic Compounds 1 ppm AIHA (TVOC) Respirable Particulates (PM 25) 65 micrograms per cubic meter of air USEPA NPAAQS-G for general population USEPA

USEPA= United States Environmental Protection Agency NPAAQS= National Primary Ambient-Air Quality Standard AIHA= American Industrial Hygiene Association ASHRAE= American Society of Heating, Refrigerating, and Air Conditioning Engineers

Contract Costs

The total contract cost from January 21, 2002 to June 30, 2002 is estimated to be $393,518.92. A letter of explanation from the vendor and specific information pertaining to the ambient air sampling completed at PS 894 is attached to this PW. The following information from the applicant and the applicant’s vendor was used to compute the total eligible cost:

The first set of contract costs cover the period from January 21, 2002 to February 11, 2002, a 21 -day period. The cost per day for this first section of the contract is $307.19 per day (see attached letter from the vendor). Additionally, the second set of contract costs cover the period from February 12, 2002 to June 30, 2002, a 139-day period. The cost per day for the second section of the contract is $2,785.71 per day. The vendor stated that the reason for the increase in cost per day from the first section of the contract to the second section of the contract is that the BoE had requested additional testing stations, tests, and analytical. The following table demonstrates how the costs in this PW were derived.

Contract Dates Cost Per Day Number of Total Days 01/21/02 to 02/11/02 $307.19 21 $6,450.99 02/12/02 to 06/30/02 $2,785.71 139 $387,213.69 TOTAL ELIGIBLE 146 $393,664.68

Percentage of Work Completed

The percentage of work complete was calculated through April 22, 2002. As such, for 91 days of the 160 day period, the work performed by ATC Associates has been completed. The BoE has not been invoiced for these costs, and therefore the dollar amount in this PW is based on an estimate provided by the applicant’s vendor, ATC Associates.

91 days/ 160 day period = 90/160 = 57% of the work complete.

Prepared By: Matt Talley, Project Officer FEMA Form 90-91 (BACK), Sep 98

CITY_21MC100_003267238

NYC-WTC_000324194

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000324194Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

FEMA project worksheet, PS 894

NYC-WTC_000250251

FEMA project worksheet for PS 894 air monitoring with multiple test locations in the school interior.

Similar indexed content

Compare copies and versions →