NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Project worksheet, BOE monitoring, Apr 2001

Machine-extracted title · confidence 34%

OMB project worksheet for air-monitoring at PS 89 IS 89 vicinity, April 2001.

NYC-WTC_000385828–000385829
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

) Parameter Target level Agency or Organization Temperature (T) Summer: 73-79 degrees at 50% RH ASHRAE 55 Winter: 68-75 degrees at 50% RH Relative Humidity (RH) ■30^60% ASHRAE 55 Carbon Dioxide (C'O2) <700 parts per million (ppm) above ASHRAE 62 background level Carbon Monoxide 9 ppm USEPA NPAAQS (as sited m ASHRAE 62) Total Volatile Organic Compounds 1 ppm AIHA (TVOC)________________________ Respirable Particulate'! (PM 25) 65 micrograms per cubic meter of air USEPA NPAAQS-G for general population; 40 micrograms per cubic meter of air USEPA which is recommended for sensitive individuals and children

USEPA== United States Environmental Protection Agency NPAAQS= National Primary Ambient-Air Quality Standard AIHA= American Industrial Hygiene Association ASHRAE= American Society of Heating, Refrigerating, and Air Conditioning Engineers

Contract Costs

The total contract cost from January 22, 2002 to June 30, 2002 (the end of the school year) is estimated to be $184,203.93. A letter of explanation from tie vendor and specific information pertaining to the ambient air sampling completed at IS 89 is attached to this PW. The following information from the applicant and the applicant’s vendor was used to compute the total eligible cost:

The eligible costs incurred from January 22, 2002 to June 30, 2002 (160 days) = $184,203.93 (see attached sheet)

Percen^ge oTV^rk Completed

The percentage of work complete was calculated through May 6, 2002. As such, for 104 days of the 160 day period, the work perfonned by ATC Associates has been completed. The BoE has not been invoiced for these costs, and therefore the dollar amount in this PW is based on an estimate provided by the applicant’s vendor, ATC Associates.

104 days/ 160 day period = 65% of the work complete.

Prepared By: Matt Talley, Project Officer FE^. Form QOWflS^K), Sep 98

CITY_21MC100_009214694

NYC-WTC_000385829

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000385829Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000187879

FEMA project worksheet detailing air monitoring stations and testing schedules established at a New York City school in early 2002.

Similar indexed content

Compare copies and versions →