NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Project worksheet, BOE monitoring, Apr 2001

Machine-extracted title · confidence 34%

OMB project worksheet for air-monitoring at PS 89 IS 89 vicinity, April 2001.

NYC-WTC_000385828–000385829
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EAIERGENCY MANAGEMENT AGENCY O.M.B No. 3067-0151 PROJECT WORKSHEET - .Narrative Expires April 30, 2001 / DECLARA TION NO: PROJECT NO. 5IPS NO. DATE CATEGORY FEMA-1391 -DR-NFf 061-51000-22 05/06/2002 B APPLICANT COUNTY New York City, Board oi'Education (BoE) New York

Indoor Air Monitoring

A total of 9 air-mon:itoring stations are established throughout the interior of IS 89. A total of 10 tests are conducted per day. Each test lasts approximately four hours, and samples approximately 1,800 liters of air. The station locations, the number of tests conducted, and details of the testing are listed below.

First floor hallway outside cafeteria 2 One sample from Sam-12pm and one sample from 12pm-4pm Cafete:ria 1 One sample taken during the school day Gymnasium 1 One sample taken during the school day Auditorium 1 One sample taken during the school day North Classrooms 1 One sample immediately after the last class East Classrooms 1 One sample immediately after the last class South Classrooms 1 One sample immediately after the last class Second floor Hallways south end 1 One sample immediately after the last class Fourth floor Hallways south end 1 One sample immediately after the last class Total Tests 10

Outdoor Air Monitoririg

A total o"3 exterior air-rnonitoring stations are established on the exterior of IS 89. A total of 6 tests are conducted per day. Each test lasts approximately four hours, and samples approximately 1,800 liters of air. The station locations, the number of tests conducted, and the details of the testing are listed below.

Inside playground, north side 2 n_________ acMJ One sample from Sam-12pm and one sample from 12pm-4pm Inside playground, south side 2 One sample from Sam-12pm and one sample from 12pm-4pm__________ Fifth floor roof 2 One sample from Sam-12pm and one sample from 12pm-4pm Total Tests IM cW SSiftffi

Paramete rs of Testing

Results from the samples collected each day will be reported verbally no later than Sam the next day to the BoE. A written report will then be submitted by the end of that day that will report the analytical data collected, A plan has been devised in the case that testing results exceed the target levels that are provided below.

CITY_21MC100_0 09214693

NYC-WTC_000385828

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000385828Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000187879

FEMA project worksheet detailing air monitoring stations and testing schedules established at a New York City school in early 2002.

Similar indexed content

Compare copies and versions →