Temperature (T) Summer: 73-79 degrees at 50% RH ASHRAE 55
Winter: 68-75 degrees at 50% RH
Relative Humidity (RH) ■30360% ASHRAE 55
Carbon Dioxide (CO2) <700 parts per million (ppm) above ASHRAE 62
background level
Carbon Monoxide 9 ppm USEPA NPAAQS (as sited in ASHRAE
62)
Total Volatile Organic Compounds 1 ppm AIHA ----- ■
(TVOC)
Respirable Particulates (PM 25) 65 micrograms per cubic meter of air USEPA NPAAQS-G
for general population; 40
micrograms per cubic meter of air USEPA
which is recommended for sensitive
individuals and children i
USEPA= United States Environmental Protection Agency
NPAAQS= National Primary Ambient-Air Quality Standard
AIHA= American Industrial Hygiene Association
ASHRAE= American Society of Heating, Refrigerating, and Air Conditioning Engineers
Contract Costs
The total contract cost from January 22, 2002 to June 30, 2002 (the end of the school year) is estimated to be $184,203.93. A
letter of explanation from the vendor and specific information pertaining to the ambient air sampling completed at IS 89 is
I attached to this PW. The following information from the applicant and the applicant’s vendor was used to compute the total
eligible cost;
The eligible costs incurred from January 22, 2002 to June 30, 2002 (160 days) = $184,203.93 (see attached sheet)
1
J Percentage of Work Completed
The percentage of work complete was calculated through May 6, 2002. As such, for 104 days of the 160 day period, the
work performed by ATC Associates has been completed. The BoE has not been invoiced for these costs, and therefore the
dollar amount in this PW is based on an estimate provided by the applicant’s vendor, ATC Associates.
104 days/ 160 day period = 65% of the work complete.
I
I
I
Prepared By: Matt Talley, Project Officer 1