FEMA air monitoring worksheet, PS 894, May 2002

Machine-extracted title · confidence 95%

Federal Emergency Management Agency project worksheet detailing air monitoring station locations and testing schedules at PS 894.

NYC-WTC_000174928–000174929
Page image
Scanned page image, NYC-WTC_000174929
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MAY, 7.2002 IMOAM NO. ,66 P. 5

'emperaturc (T) Summer; 73-79 degrees at 50% RJH 55 Winter: 68-75 degrees at 50% RH Relative Humidity (RH) 30-60% ASHRAE 55 Carbon Dioxide /CO2) <700 parts per million (ppm) above ASHRAE 62 background level Carbon Monoxide 9 ppm USEPA NPAAQS (as sited ih ASHRAE 62) Totals Volatile Organic Compounds 1 ppm aSa (TVOC) Respirable Particulates (PM 25) 65 micrograms per cubic meter of air USEPA NPAAQS-Q for general population USEPA

USEPA= United States Environmental Protection Agency NPAAQS= National Primary Ambient-Air Quality Standard AIHA- American Industrial Hygiene Association ASHRAE= American Society of Heating, Refrigerating, and Air Conditioning Engineers

Contract Corts

The total contract cost from January 21, 2002 to June 30, -2002 is estimated to be $393,518.92. A letter of explanation from the vendor and specific information pertaining to the ambient air sampling completed at PS 894 is attached to this PW. The following information from the applicant and the applicant’s vendor was usedto compute the total eligible cost:

The first set of contract costs cover the period from January 21, 2002 to February 11,2002, a 21-day period. The cost per day for this first section of the contract is S307.19 per day (see attached letter from the vendor). Additionally, the second set of contract costs cover the period from February 12, 2002 to June 30,2002, a 139-day period. The costper day for the second section of the contract is $2,785.71 per day. The vendor stated that the reason for the increase in cost per day from the first section of the contract to the second section of the contract is that the BoE had requested additional testing stations, tests, and analyticals. The following table demonstrates how the costs in this PW were derived.

Cuntoct Date.s Cost Per Day Number of lolat .Days

02/12/02 to 06/30/02 32,785.71 139 3387,213.69 TOTAL ELIGIBLE 146 $393,664.68

Percentage of Work Completed

The percentage of work complete was calculated through April 22,2002. As suoh, for 91 days of the 160 day period, the work performed by ATC Associates has been completed. The BoE has not been invoiced for these costs, and therefore rhe dollar amount in this PW is based on an estimate provided by the applicant’s vendor, ATC Associates.

91 days/160 day period = 90/160 = 57% of the work complete.

Prepared By: Matt Talley, Project Officer FEMA Fonn 90-91 (BACK), Sep 96

CITY_21MC100_0 12692943

NYC-WTC_000174929

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000174929Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000179985

Letter from ATC Associates reporting indoor air quality measurements collected at a school on March 21, 2002.

Similar indexed content

Compare copies and versions →