Project worksheet, BOE monitoring, Apr 2001

Machine-extracted title · confidence 32%

OMB project worksheet documenting air monitoring at NYC BOE site, April 2001.

NYC-WTC_000385817–000385818
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Parameter______________________ Target Level • - . - ■Agency or Organization . - Temperature (T) Summer: 73-79 degrees at 50% RH ASHRAE 55 Winter: 68-75 degrees at 50% RH Relative Humidity (RH) 30-60% ASHRAE 55 Carbon Dioxide (CO2) <700 parts per million (ppm) above ASHIiAE 62 background level Carbon Monoxide 9 ppm USEPA NPAAQS (as sited in ASHR.AE 62)_________________________ _ Total Volatile Organic Compounds 1 ppm AIHA (TVOC) Respirable Particulates (PM 25) 65 micrograms per cubic meter of air USEPA NPAAQS-G for general population; 40 micrograms per cubic meter of air USEPA which is recommended for sensitive individuals and children

USEPA= United States Environmental Protection Agency NPAAQS= National Primary Ambient-Air Quality Standard AIHA= American Industrial Hygiene Association ASHRAE= American Society of Heating, Refrigerating, and Air Conditioning Engineers

Contract Costs

The total contract cost from September 12, 2001 to January 22, 2002 is estimated to be $34,771.52. A letter of explanation from the vendor and specific iiiformation pertaining to the ambient air sampling completed at IS 89 is attached to this PW. The following information from the applicant and the applicant’s vendor was used to compute the total eligible cost:

The eligible costs incurred from September 12, 2001 to February 11, 2002= $40,000.00

Given cost of services= $80,000 (see attached sheet) Divided by two because PS 89 is co-located with IS 89 $80,000.00 X .50= $40,000.00

Because IS 89 returned on January 22, 2002, the above amount was adjusted to include only those costs through January 22.

09/12/01 to 1/22/02 = 133 days $40,000/ 153 days = $261.44 per day $261.44 * 133 days = $34,771.52

Percentage of Work Completed

The percentage of work complete was calculated through January 22, 2002. As such, all of the work performed by ATC Associates has been completed. The BoE has not been invoiced for these costs, and therefore the dollar amount in this PW is based on an estimate provided by the applicant’s vendor, ATC Associates.

133 days/ 133 day period = 100% of the work complete.

j Prepared By: Matt Talley, Project Officer FEMA Form 90-91 (BACK), Sep 98

CITY_21MC100_009214664

NYC-WTC_000385818

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000385818Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →