ASBESTOS INSPECTION REPORT PAGE 1 OF 1
PREMISE ADDRESS
14 Wall Street WWW^T2/3OA)2
ZIP ^RO CODE BLOCK. LOT
k®; Facades SQUAD 1 BADGE# AO78
PHOTOS TAKEN Yk
INSPECTOR R, RAMMOHAN BLDG . TYPE A BASK OF INSPECTION TRU1790MN02
ISro^XsE^sV^'kemoval Corp. SAMPLE NO.--------
129 Street CollegeVoint SAMPLE NO.'
SAMPLE NO,
sy 1-4100
^^OTW^l^^er Engineers P.C. WT^JTWall Acquisitions
45 Street New^ork IT^all Street New York
Sy idiTn (2¥gr^22-oo77______ ZIP PHONE
CONTACT PERSON Ravi Dindayal, Chief Engineer TIME OF INSPECTION FROM: 8 am__ 5 pm___
INSPECTION DISCLOSED:
10/26/02 ; Jan Wolkovicz and Five handlers began setting up the decon on the roof and began cleaning various
spots of the roof. Air monitoring was perfomed by Warren&Panzer.
10/27/02: The crew continued the cleaning in the roof and completed the roof at the end of the day.
11/30/02: Jan wolkovicz and six handlers came on site and setup scaffoldings on the 10* floor setback. Decon was
setup at 10* floor for the exterior fa?ade clean up.Two windows and ledges fo two facades facing east and west
were completed. Oghogho performed air sampling.
12/01/02: Jan Wolkovicz and four handlers from Trio and Oghogho Erhaber of W&P on site. A large scaffolding
was utilized to clean window s and ledges. At the end of the day that facade facing pine street was completed.
12/14/02: Jan Wolkovicz and six handlers and Festy Osemvegie of W&P were on site. Two scaffolds on Nassau
Street were up on the facade for windows and ledges cleaning. Cleaning started from the 18* floor since cables
were dropped from the vacant 19* floor. Debri observed only from 19* and down on ledges. Cleaning was done up
to 8* floor at the end of the day.
12/15/02: The same crew came on site and continued cleaning and the cleaning was completed at the end of the day
for that fa?ade.
12/21/02: Jan Wolkovicz and six handlers and Festy Osemvegie were on site. Two scaffolds were ready for the
fafade of the pyramid building on wall street. Handlers began cleaning window and ledges from 18* floor and
down. Cleaning was done up to 7* floor at the end of the day.
12/22/02; The same crew continued the cleaning on fa?ade. At the end of the day facade cleaning was completed
and the scaffolds were dismantled. Crew vacuumed the ledges of 19* floor on Wall and Nassau Street sides.
12/30/02; Jan Wolkovicz and four handlers came on site to clean the facade west of main entrance on Wall street
from floors five and down where debris observed. A Genie manlift was utilized and the work was started at 6pm
and completed at 12:30am. This completes the project in the entire building.
Project Completed.
NOV# INFRACTIONS RESULT CODE
5
NOV# SupervisOfeS jnItialS
■BROT BROOKLYN 4 = ( lBBBWS-8»'a
BLDG.TYPE A>6STORIES B<6STORIES C SINGLE FAMILY
D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY
RESULT CODES 1 = Violation Issued 2 = No Violation Issued 3 = No access
4 = Project not Started (no NOV) S = Public Owned Property ACP3093
CITY_21MC100_005037560
NYC-WTC_000385720