Lab report, URS cleaning/air monitoring, USPS WTC

Machine-extracted title · confidence 38%

URS report outlining disaster cleanup and air monitoring after 9/11 at lower Manhattan USPS facilities.

NYC-WTC_000366596–000366598
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

URS October 3,2001

Mr. Nicholas DeCarlo, CHMM, CPEA Environmental Compliance Specialist New York Metro Area United States Postal Service James A. Farley Building 421 8'^ Avenue, Room 5013 New York, New York 10199-9800

Re: Disaster Response and Recovery Lower Manhattan, New York Unoccupied Buildings - Cleaning and Air Monitoring Peck Slip Station URS Project No. 89-FUSPS035.02

Dear Mr. DeCarlo:

URS Corporation (URS) was retained by the United States Postal Service (USPS) to provide disaster response and recovery services with regard to several USPS facilities in lower Manhattan following the September 11, 2001 disaster at the World Trade Center. URS was tasked with the following:

• Subcontractor coordination for operations and maintenance (O&M) level clean up of standing dust on facility surfaces. This would consist of HEPA-vacuuming and wet­ wiping of readily accessible horizontal and vertical surfaces (10 feet and below); arranging for the removal/replacement of facility HVAC filters; and, if needed, the repair or removal of any damaged asbestos-containing materials (ACM);

• Non-aggressive indoor air sampling following the aforementioned clean up with air samples analyzed for asbestos (via transmission electron microscopy [TEM]), lead, silica, and nuisance dust. The number of samples to be collected in each facility would be determined by the functional work floor square footage, with samples analyzed on an expedited basis;

• Visual evaluation of any existing ACM to determine if any repair/reraoval would be necessary during the clean up phase.

URS subcontracted Comprehensive Environmental Solutions (CES) to perform the required O&M clean up in the facility. The clean up at Peck Slip Station took place on September 16 and 19, 2001. Minor areas of damaged ACM were noted on the 4'*’ floor of Peck Slip Station and a subsequent asbestos abatement occurred on September 19, 2001. That abatement is detailed in a separate letter report.

Filters for the heating, ventilation, and air conditioning (HVAC) system at Peck Slip Station w'ere changed following completion of the O&M cleaning operation. URS Corporation 200 Orchard Ridge Drive, Suite 101 Gaithersburg, MD 20878-1978 Tel: 301.258.9780 Fax: 301.869.2043

CITY_21MC100_002352477

NYC-WTC_000366596

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000366596Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →