Letter enclosing URS Corporation reports on cleanup activities and air monitoring at 1 Peck Slip dated March 2002.

NYC-WTC_000120318–000120321

Folder label: “1 PECK SLIP Block: 106 Lot: 9 BIN: 1001363 Peck Slip Post Office, 1-19 Peck Slip

Page image
Scanned page image, NYC-WTC_000120319
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

LIJ October 3, 2001

Mr. Nicholas DeCarlo, CHMM, CPEA Environmental Compliance Specialist New York Metro Area United States Postal Service James A. Farley Building 421 8th Avenue, Room 5013 New York, New York 10199-9800

Re: Disaster Response and Recovery Lower Manhattan, New York Unoccupied Buildings — Cleaning and Air Monitoring Peck Slip Station URS Project No. 89-FUSPS035.02

Dear Mr. DeCarlo:

URS Corporation (URS) was retained by the United States Postal Service (USPS) to provide disaster response and recovery services with regard to several USPS facilities in lower Manhattan following the September 11, 2001 disaster at the World Trade Center. URS was tasked with the following:

• Subcontractor coordination for operations and maintenance (O&M) level clean up of standing dust on facility surfaces. This would consist of HEPA-vacuuming and wet- wiping of readily accessible horizontal and vertical surfaces (10 feet and below); arranging for the removal/replacement of facility HVAC filters; and, if needed, the repair or removal of any damaged asbestos-containing materials (ACM);

• Non-aggressive indoor air sampling following the aforementioned clean up with air samples analyzed for asbestos (via transmission electron microscopy [TEM]), lead, silica, and nuisance dust. The number of samples to be collected in each facility would be determined by the functional work floor square footage, with samples analyzed on an expedited basis;

• Visual evaluation of any existing ACM to determine if any repair/removal would be necessary during the clean up phase.

URS subcontracted Comprehensive Environmental Solutions (CES) to perform the required O&M clean up in the facility. The clean up at Peck Slip Station took place on September 16 and 19, 2001. MinQr areas of damaged ACM were noted on the 4 floor of Peck Slip Station and a subsequent asbestos abatement occurred on September 19, 2001. That abatement is detailed in a separate letter report.

Filters for the heating, ventilation, and air conditioning (HVAC) system at Peck Slip Station were changed following completion of the O&M cleaning operation. URS Corporation 200 Orchard Ridge Drive, Suite 101 Gaithersburg, MD 20878-1978 Tel: 301.258.9780 Fax: 301.869.2043

NYC-WTC 000120319

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000120319Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →