I October 3. 2001
I .Mr. Nick DeCarlo, CHMM, CPE.A
District Environmental Compliance Coordinator
I United States Postal Service
New York District
James A. Farley Building
I 421 .S" Avenue, Room 5013
New York, New York 101 99-9800
I Subject; Peek Slip Station
4'^ Floor Asbestos Abatement
I URS Project No. 89-FUSPS035.02 42001
Dear Mr. DeCarlo:
I During cleaning of standing dust from Peck Slip Station during the week of September 17, 2001,
damaged asbestos-containing materials (.ACM) were discovered on the 4“’ floor of the facility. These
I materials consisted of small area.s of damaged asbestos-containing pipe insulation (4“' floor men’s
restroom) and loosc/broken 9" x 9” asbestos-containing floor tiles. Additionally, repair of asbestos
containing pipe insulation ends needed to be performed using non-asbestos lagging cloth.
I Comprehensive Environmental Services, Ine. (CES), who was onsite to conduct the standing dust
cleanup, was also tasked with performing the ACM abatement and repair. That abatement /repair
operation was completed on September 19. 2001.
I .Air monitoring conducted: by URS Corporation (URS) during the minor abatement operation indicated
acceptable air quality as per the requirements established by the New York City Department of
I Environmental Protection (NYCDEP). Air samples were analyzed by phase contrast microscopy (PCM)
in iiccordance with NIOSH Method 7400 and resulted in airborne fiber concentrations of <0,01 fibers
per cubic centimeter (fee) of air sampled. The URS field log and all sampling/analytical data are
I included as an attachment to this report.
It should also be noted that following the asbestos abatement, the entire 4'*’ floor was cleaned of residual
I standing dust by CES in accordance with the LISPS post-disaster clean up protocol, followed by air
sampling and analysis for asbestos and other potential contaminants. The airborne asbestos analysis for
this clean up effort was conducted by transmission electron microscopy (TEM) and resulted in no
I asbestos structures detected.
Based on rhe satisfacior)> air monitoring, the 4^^ floor of Peck Slip Station is considered acceptable for
I re-occupancy. It .should be noted that additional ACM exists on the 4"* floor as well as in other areas of
the facility, however, the damaged material existing on the 4* floor at the time of this effort had been
cleaned up/a bated/re paired during the course of this clean up.
I
I URS Ccrporalion
200 Orcnartl Rid&e Drive, Suite lOL
Gaithersburg. MO 20S7S
For. 301.258.3780
I F.ii 301.869 8728
n89-FUSPSOOO O(HACTrvE WORK OROERSIWO OlSVUfwcuppwtl FaalilrenPack Slip SlatnjniUSPSfjBckslipaibabateMIfinaluBport Q23
CITY_21MC100_008873621