NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection report, 95 [name] Annex

Machine-extracted title · confidence 32%

Asbestos inspection report for 95 [name] Annex with inspector and timing details.

NYC-WTC_000363505
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT PAGE 1 OF 1 PREMISE ADDRESS 95 Maiden Lauc (Federal Reserve Annex) §7rW-“«i6/02 ZIP ^RO CODE BLOCK LOT SQUAD 1 BADGE# AO78 PHOTOS TAKEN Yes inspectorR. RAMMOHAN BLDG.. TYPE f BASIS OF INSPECTION TRUI SOO MH 02.

“fMgWIiemovalCorp. SAMPLE NO.

129 Street CollegeYoint SAMPLE NO.- SAMPLE NO, 15V" 1B56 (W61-4100 ^^^^W^zer Engineers P.C. PeSeral'^eserve Bank 45 Street New'Vork ^^flj^erty Street New York SV® Idffl? (2T2T^22-OO77 109b5 (2i’?n22-5535 CONTACT PERSON John Bums TIMEOF INSPECTION FROM; 8am-8pm

INSPECTION DISCLOSED: 8/12/02 (Monday): Jan Wolkowicz and 6 handlers arrived on site and mobilization began. Until 1 lam Warren & Panzer Project Monitor was not on site. I spoke to Steve Parmagiani and Joseph Bonder of Trio and they claimed that they had informed W&P of the 8/12/02 schedule of 95 Maiden Lane. The handlers were sent home after building the decon and setup of water and electric. 8/13/02 (Tuesday): Jan Wolkowicz and 7 Handlers & Dipo Elemez of Warren&Panzer, The Project monitor showed up onsite with only two air sampling pumps. He claimed that he was instructed by Benny of W&P to gather pumps at 45 Wall Street and could not able to locate the pumps. Then Dipo went to Ann Street and gathered 4 more pumps and began sampling. South east wing of the roof gravel washing was completed and midsouth section was ongoing at the end of the day. 8/14/02 ( Wednesday): Jan Wolkowicz and 7 handlers & Dipo Elemez of Warren&Panzer were on site. Roof gravel washing was ongoing all day. 8/15/02 ( Thursday): Jan and 7 handlers & Dipo of W&P were on site. Roof gravel washing continued. 8/16/02 (Friday): Jan and 7 handlers & Dipo of W&P were on site. Gravel washing on bulkhead roof started. At 2:30 pm all bulkhead roofs were completed and visual inspection was satisfactory. Crew began double bagging the waste bags. Approximately 800 bags were generated. All washing was completed and bagout to continue on the next day(8/17/02

Project completed.

NOVi^i INFRACTIONS RESULT CODE 5 NOV# <t:PCt!Vl56R<; INITIALS

tSVIRV MANHATTAN 2 — BRO? 3 — BRCXjKLVN UEENS 5 51 AlJLN 15L7C

BLDG. TYPE A>6STORIES B<6STORIES C SINGLE FAMILY D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY RESULT CODES 1 = Violation Issued 2 = No Violation Issued 3 = No access 4 - Project not Started (no NOV) 5 = Public Owned Property ACP3093

C ITY_D E P_WO R B Y_C AN N ATA_S U BP_000002300

NYC-WTC_000363505

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363505Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →