NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 14 pages

WTC cleanup program roles and responsibilities

Machine-extracted title · confidence 40%

USEPA/DEP roles for the WTC cleanup program and safety oversight.

NYC-WTC_000363028–000363041
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

8. In the event that mold is observed in a residence during the pre-cleaning inspection, the Monitoring Contractor will contact the NYCDOH and EPA.

Deliverables

The Project Monitor shall record if mold is present and notify the NYCDOH and EPA. This information shall be provided via EPA Indoor Air web database or an agreed, upon alternative electronic foimat or website approved by EPA within 24 hours olhjctivitv. WB'-. ill

9. The Project Monitor shall schedule and oversee the cleaning operation! the Cleaning Contractor. No residential, common space or HVAC system shall be cleane< al the exterior of the building has been cleaned or approved by 'a scheduling*! cm arises the Project Monitor should contact EPA. The Project ' shall coordinate dailv access for cleaning and sampling with residents, owners, ing Contractor and sampling technicians. ^5

10. The Monitoring Contractor shall provide.^ rent pcisonnel provide periodic (3- 4hours/unit) oversight of the Cleaning ( iintri to verify that wi is being conducted in J - . 1 accordance with the Cleaning Contad Scope J 11. The Project Monitor shall verifj^j||at the Cie: ting 8 'or is using properly trained and certified NYSDOL and NYCDEP certifh^ workers.

12. The Project Monitor shall induct ro quality assurance inspections during the course of cleaning and concur Jing the I ing Checklist (to be developed) for tasks completed satisfactorily. ■I

Deliverables Yllllilllllifc.:

The Project Bonito)r shall rcvie all deliverables prior to submission to EPA. The review shall assure that eai iverable is accurate and complete, technically sound, and free of clerical errors.

The Project monitor shall submit the completed Cleaning Checklist via F2L or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity. Sil

y ’rojec'l Monitor shall perform a final visual inspections upon completion of the cleaning. areas are not dust free then the Project Monitor will direct the Cleaning Contractor to reclean as necessary. If all areas are dust free then the Project Monitor will authorize final air sampling. Final inspections shall be documented using the Cleaning Checklist.

Deliverables

CITY_2IMCl00_000439046 NYC-WTC_000363032

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363032Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000363004

Continuation of draft scope for indoor cleanup and sampling.

Similar indexed content

Compare copies and versions →