NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 14 pages

WTC cleanup program roles and responsibilities

Machine-extracted title · confidence 40%

USEPA/DEP roles for the WTC cleanup program and safety oversight.

NYC-WTC_000363028–000363041
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

determination is to be made based the descriptions included in the Cleaning Contract Scope of Work and best professional judgement.

Deliverables

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall assure that each deliverable is accurate and complete, technically sound, and free of clerical errors.

Data to be input shall include but is not limited to, start anti completion daie.s for cleaning t^e sample media, flow media type, flow rates (start/fii plow rate (average), tirne (start/fiinsh), Total elapsed time (min). Calculated sample v(^ le (L), pump fault, wetithcr. units. QC samples (lot blank) sampling dates, sample id| fication numbers, sam pling technique (aggressive, or modified aggressive) residential ommercial/residential). dust (low/high). mold, residents with special needs, clean-up r (Scope A or B), written access authorizations, and identification of areas to be cl I The Project Monitor shall record all pre-cleaning and pre-inspcction information the EPA Indoor Air database or an agreed upon electronic format.yl'his information shall include but, not limited to actual sampling date and tnu exlenor e\aluat^^pass/fail), type of HVAC system (central, individual or none), HV.A.C impacted (Y/N), occupant present (Y/N), written access authorizations (Y/N), EPA approwl (Y/N), space occupied (Y/N), mold present (Y/N). Dates and times shall be associated with all activities including start and finish date.

All deliverables shall be provided in the EPA Indoor Air web database via F2L or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

7. The Monitori ^contractor , evaluate all HVAC systems in all residential buildings where cleaning will take place tS rmine if these systems have been impacted by dust or debris from the col apse of the ' Id Trade Center and if these systems require cleaning. No residential or cori ice shall be cleaned until the HVAC system has been evaluated and b,. cleaned as neces ■ Deliverables

rhe Project Monitor shall review all del iverables prior to submission to EPA. The review shall assure that each deliverable is accurate and complete, technically sound, and free of clerical errors.

The Project Monitor shall record if the HVAC systems have been evaluated and cleaned, impact from dust/debris. If yes, when and by whom? This information shall be provided via F2L or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

CITY_21MC100_000439045 NYC-WTC_000363031

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363031Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000363004

Continuation of draft scope for indoor cleanup and sampling.

Similar indexed content

Compare copies and versions →