NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/2002 E-Mail Sent M. Gilsenan
Document / 18 pages

2002 E-Mail Sent M. Gilsenan

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000139482–000139499
Page image
Scanned page image, NYC-WTC_000139492
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

is to be made based the descriptions included in the Cleaning Contract Scope ofWork and best professional judgement.

Deliverables

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall assure that each deliverable is accurate and complete, technically sound, anj^ee of clerical errors.

Data to be input shall include but is not limited to, start and confll^^^^s for cleaning the sample media, flow media type, flow rates (start/final, flow rate (average^ time (startZfini^, Total elapsed time (min). Calculated sample volume (L), pump fault, weather, units, QC samples (lot blank) sampling dates, sample identification numbers, sampling technique (aggressive, or modified aggressive) residential use (commercial/residential), dust (low/high), mold, residents with special needs, clean-up nWl^l^ope A or B), written access authorizations, and identification of areas to be cleaned.

The Project Monitor shall record all pre-cleaning and pre-inspection information the EPA Indoor Air database or an agreed upon electronic format. This information shall include but, not limited to actual sampling date and time, exterior evaluation (pass/fail), type of HVAC system (central, individual or nonej^j^AC impacted (Y/N), occupant present (Y/N), written access authorizations (Y/N), EP, \approval (Y/N), spaceOocupied (Y/N), mold present (Y/N). Dates and times shall be assoeis... with i^ctivities including start and finish date.

All deliverables shall be pi 5vided in 1^ ^PA Ind^br Air web database via F2L or an agreed upon j^temative elecfrpn format oA /ebsite approved by EPA within 24 hours of activity. BIO ' i TheMfon contrac^saj;:^ evaluate all HVAC systems in all residential buildings where cleaning • bpiacetodi tine if these systems have been impacted by dust or debris from the the ►'Trade Center and if these systems require cleaning. No residential or co™ bpace si 11 be cleaned until the HVAC system has been evaluated and cleaned as necessary.

Deliverables

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall •e that each deliverable is accurate and complete, technically sound, and free of clerical 8, ■I The Project Monitor shall record if the HVAC systems have been evaluated and cleaned, impact from dust/debris. If yes, when and by whom? This information shall be provided via F2L or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

NYC-WTC_000139492

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000139492Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →