NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 14 pages

WTC cleanup program roles and responsibilities

Machine-extracted title · confidence 40%

USEPA/DEP roles for the WTC cleanup program and safety oversight.

NYC-WTC_000363028–000363041
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Indoor Air Residential Assistance Program Monitoring Contract Scope of Work DRAFT - 6/24/02

A. Introduction All work performed under this contract must be: in compliance with all applicable, relevant, and appropriate regulati ons and this Scope of Work, including but not limits ;o tl:hose of the United States Environmental Protection Agency (EPA), the United States Dept It of Labor, ■

Occupational Safety and Health Administration (OSHA), the New Yorii 2 Department of , Labor (NYSDOL), the New York State Department of Health Environmei Laboratory Approval Program (ELAP) and the New York Lily Department of Enviroi ;ction (NYCDEP). This project shall involve site inspections, surxeys, and assessment!' luling, coordinating and monitoring the clean up of dust/debris and sampling from bull Srtments impacted by the collapse of the World Trade Center. '"c/ffebf/fl-

B. Roles and Responsibilities The USEPA has overall responsibility for insuring that work conducted a 5 part of the Indoor Air Residential Assistance Program is completed safely, efficiently and in a compliance with the Scope of Work. As such, EPA shall have ihefolluwing authoiities relating to work conducted under this contract:

1. The authority to stop work Oalth and safety reasons or for non-compliance with the Scope of Work. | ■■■

If III jir 2. The authority to direct the contraci:tor in the performance of the work. Jill®* 3. ,ty to I cv iew iprove or disapprove of the qualifications of all contractor peri crvolved in th .. 4. The right to !, inspect and accept or reject any work .

W* WB C, Qualifications Proof of qualifications must be presented upon request, including qualifications for wipe sampling, personal monitoring and HVAC evaluations.

P ■ t M 't s The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects. The Project Monitor must have access to translation services to schedule pre cleaning unit inspections with residents.

CITY_21MC100_000439042 NYC-WTC_000363028

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363028Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000363004

Continuation of draft scope for indoor cleanup and sampling.

Similar indexed content

Compare copies and versions →