NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 14 pages

WTC cleanup program roles and responsibilities

Machine-extracted title · confidence 40%

USEPA/DEP roles for the WTC cleanup program and safety oversight.

NYC-WTC_000363028–000363041
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.

Sampling Parameters Methods 1. Asbestos NIOSH Methods 7400 & 7402 2. Total Metals EPA Method SW-846 601 OB 3. Mercury EPA Method SW-846 7471 Mils ► D. Specifications ■Il. JF iitr lii Clean up activities shall be scheduled for 20 units perl Air sampling shalli ctlulcd and completed in these units upon successful visual i nspectid Project Monitor (F24 hours. Air sampling shall also be provided at 10 to 20 units wl ip activities are not scheduled. Sufficient personnel shall be available for project monit enpling.

The contractor shall have available sufficient quantities of sampling cq lipment to provide the amount and type of samples required for this project. a minimum bllowing equipment is required: air-sampling pumps with flow rate capacities > 0 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters havi X)re size of 0. Sum.

The Monitoring Contractor shall prepare a 11 cal th and Safety Plan (HASP) in accordance with 29 CFR1910.1001 and 29 CFR 1926.58. All personnel involved in residential cleaning and monitoring activities shall follow the contractor Health anil Safety Plan (HASP) prepared by their employer. EPA shall be provided with a copy of the employer H ASP prior to the start of work.

The Project Monito' shall att a :k off meeting prior to commencement of sampling activities. At this time, the Coutractoi )ut not limited to, participate in scope of work discussions, sampling logistics, obtaining resi es for residential information provided by EPA and DEP and demonstrating data )n proi ■dures and software.

The Contractor shall atten eetings or conference calls with EPA and coordinate field activities, as requested. IlF

All appropriate data, original field forms/data sh(jets, and chain-of-custody forms shall be completed in accordance with the instructions contained in the contract and provided to EPA. All samples and copies of necessary documentation shall be hand delivered to EMSL laboratories at: 307 W. 38"’ St., New York, New York 212-290-0051. This irformation may also be provided via EormsII Lite (f: itemative electronic format that is accessible by the laboratory.

Deliverables

All deliverables shall be provided via F2L or an agreed upon alternative electronic format approved by USEPA and DEP.

CITY_21MC100_000439043 NYC-WTC_000363029

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363029Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000363004

Continuation of draft scope for indoor cleanup and sampling.

Similar indexed content

Compare copies and versions →