Site inspections and dust sampling (Draft 7/2/02)

Machine-extracted title · confidence 37%

Site inspections, surveys, and coordination for dust/debris cleanup.

NYC-WTC_000363017–000363027
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Indoor Air Residential Assistance Program Monitoring Contract Scope of Work DRAFT - 7/2/02

A. Introduction All work performed under this contract must be in compliance with all applicable, relevant, and appropriate regulations and this Scope of Work, including but not limited to those of the United States Environmental Protection Agency (EPA), the United Slates Department of Labor, Occupational Safety and Health Administration (OSHA), the New York Slate partment of Labor (NYSDOL), the New York State Department of Health Environmental IHi ■ Approval Program (ELAP) and the New York <2ity Department of Environmei 1 Protection (NYCDEP). This project shall involve site inspections, surveys, and assessmem rg, coordinating and monitoring the clean up of dust/debris and sampling fi-om buiL nents impacted by the collapse of the World Trade Cimter.

B. Roles and Responsibilities The USEPA has overall responsibility for insuring that work conducted as part of the Indoor Air Residential Assistance Program is completed safely, efficiently and in a compliance with the Scope of Work. As such, EPA shall have the following authorities relating to work conducted under this contract: Jlitir ..fr 1. The authority to stop work for health and safety reasons or for non-compliance with the Scope of Work.

2. The authority to direct the contractor in the performance of the work. Jillli. .. .... . 3. The authori ty to review and approve or disapprove of the qualifications of all contractor personnel involved in the work. Bh' F' 4. The in spec: accept or reject any work .

C«ilBualifications IF Proof of qualifications must be presented upon request, including qualifications for wipe sampling, personal monitoring and HVAC evaluations.

The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects. The Project Monitor must have access to translation services to schedule pre cleaning unit inspections with residents.

CITY_2IMCl00_000439031 NYC-WTC_000363017

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363017Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140306 · Box DEP Box 05

Procedures for obtaining work authorization, monitoring residential and HVAC cleaning, and reporting hazardous conditions to EPA.

Similar indexed content

NYC-WTC_000140537 · Box DEP Box 05

Draft scope of work document detailing compliance requirements and procedures for residential cleaning and air sampling south of Canal Street.

Similar indexed content

Compare copies and versions →