NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

ZAR Realty: Settled Dust Bulk Sampling

Machine-extracted title · confidence 44%

Bulk sampling results for settled dust on multiple building levels.

NYC-WTC_000362379
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

INNFAX'SERUICE P. 1

ZAR REALTY 100 CjnjRCH STREET NEWYORK»NY SETTLED DUST BULK SAMPLING RESULTS

September 28,2001 FI,OOR/ #OF AREAS NEEDING SQUARE FEET LEVEL BULKS ASBESTOS CLEANUP OF AREA (SF) REMARKS Sub-Cellar 5 Area Not Acceasiblo. No samples NA Level Flooded Cenor 12 Engine room and all areas with dust 30,000 ■pn 12 Dept of Labor (South West side) Lobby Area @ Front Entrance 2.000 I South West Corner 4.000 24 "Tfo WORK ON THIS FL6OR mr All samples negative 19 NO WORK. ON THIS FLOOR NA ■nr No WORK ON nils FLOOR " nr All samples negative 19 NO WORK ON THIS FLOOR NA All samples negative 19 North East Side 2,000 7^ 12 Entire Office Space of Floor 42,0(30 MER-Fresh air Intake/Plenum 1,300 Including ail filters 18 Bast Side of Floor S.ooo North East Comer 4,000 gin (8 NO WORK ON THIS FLOOR NA All samples negative To^ 10 Sooth West Comer 3W TT^ 12 South West Corner 2,000 10 South West Corner 6,000 IT South Eist Side of Coro Area 2,000 Fire Door w/ACM 12 NO WORK ON THIS FLOOR NA All samples negative IT South Central Side of Core Area 1.000 Tire Door w/ACM n™" IT NO WORK ON THIS FLOOR 'NA ~Aii samples negative Jl 4)0 nAAotiim 17 South West Side 2,500 Two locations ■55™' IT South West Side East Side 3,000 2P< Penthouse 5 Rest Rootn-North West Comer 250 MERs 19 Abandoned Unit (DC-2) 100 Remaining areas of the (East and East and West Fan West side) Rooms-all samples negative Roofs 5 All exposed liorizontal surfaces and RoefAreas: 54,000 Based on footprint of (20"'and all exterior ledges on facade. Also building and all above) all roof entrances into building. Facades; 230,000 facades. TOTALS: 324 Interior: 121,650 Roof Areas: 54,000 £BUdSlu22]LQllQ GRAND TOTAL: 405,650

NOTES: 1, Quantity of affected areas per area per floor to be cleaned is approximate. Final determination to be made in field with Engineer. 2. Ah filters in alt Air Handling equipment are to be removed and diEposed as contaminated debris. Coordinate with Building Engineer for exact locations of units. 3. All other areas of respective floors, in which bulk samples tested negative for the presence of asbestos, cleanup can proceed a* non-asbestos project, 4. On floors wldt non-ACM and ACM areas coordinale with Building Management. Recommend that all ACM cleanups be completed prior to general cleanup,

2U334

be 33tfd S33i/\y3s HONwyg 6aE,Lga3TE9 S0:SX laaZ/ET/TX

CITY_DEP_WORBY_CANNATA_SUBP_000019556

NYC-WTC_000362379

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000362379Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000268577

Dust bulk sampling results for asbestos at 100 Church Street settlment areas, Sept 2001.

Similar indexed content

Compare copies and versions →