NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

FEMA project worksheet, April 2002, NY BOE

Machine-extracted title · confidence 34%

FEMA project worksheet narrative on WTC construction materials.

NYC-WTC_000359488
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGEWCY MANAGfcMfcNl AOtNCV No. 3067-0161 PROJECT WORKSHEET - N«rr«llv« Btwcl Cxpiret April 30. 2001

DECLARATION NO: I PROJECT NO. FIPS Na I CATEGORY FEMA- 1391 -DR- NY 02/27/02 APPLICANT COUNTY New York City. Board of Education New York

More than 200,000 tons of steel and 426.000 cubic yards ol cotKreie »«» uwl In KW tJKHilnKitlon ol the WTC complex. One WTC (North Tower) was completed in December of 1870 and Two WTC (6<x>ih 11»«^) »»< MWWed In January ol 1972. The federal regulations restricting the use of asbestos in concrete and oltwr UHmlhrttHM rMtSarilli^ Ki I* enforced In the early 197O's. Although asbestos gives concrete a much higher tensile siretiglh. a>tw*tM tMear* Shmwi Io have causes such diseases as Asbestosis and Mesothelioma, as well as lung cancer, when Intwiofl Iikh* MMrt* are most hazardous when they are in a friable oi pulverized slate.

The U.S. Environmental Protection Agency (EPA) - Asbestos HbzbiiI |:fli««»,|»wiliy hwuKKtiB Act (AHERA). Seclion 206 ol TCXK Substance Ccnlol Act (TSCA) states 11)81 it's legal lurtciion is to iwovK* K* ol f Meral regulations which require inspection (or asbestos-containing material and implemenlellon ol Blrti'niVK*'* »CIKX»S with respect to asbestos-containing malerial in the Nation's schools in 8 sate and complete mnnnei buU to seto WM COliptolk periodic reinspeclion of school buildings following response actions, where apptopriale. A Kkto R, H»llh»ktohnen, P E. from the Chy of New York, Department of Environmental Protection, dated Seplernber 14.2001. ^dWXre » btiUding owners on procedures for clean-up of asbestos containing materials (see attached document), T hit nwft.avKI h* U.S. Environrtienlel Proleclion Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA). Suctron 2(Xi iJ ew SwMMnce Control Act (TSCA) were used as 8 basis for the necessary procedures to be pertormed al each school.

School Construction Authority (SCA) School Construction Authority was responsible lor the coordkfwiMM* aiwl H*i**»*«M*on maiiftpemenl of the contractors on behsH of BoE. 7he School Construction Authority (SCA) acts on bohtill of ii* fHwtl ol IduCAlton (BoE) to manage all major construction, repairs, rehabilitation and clean up of all New York City t.c»KX>»» CoM* wllh th* work performed by SCA consists of regular time labor (13,619.24), including the New York Chy ftlnp* borwifH rat* for non-uniform employees of 44.66% (51,616.36). Total incurred cost for regular time UImm U IMH M. Cotie aeeociated with the overtime for labor for SCA (10,007.66), including the New York Chy overtime tUrUK ret* tor r»on»unl1orni employees of 110.73% (51,073.83). Total incurred cost for overtime labor is 511,081.4®.

KISS Construction. Inc, KIES Construction, Inc. conducted clean up al PS 234 Itooi Ocuxw- 4 k. CoUiber 7. 2001. This cleanup work consisted of asbestos abatement of the facility following the period the school wax Ireuxo nt n relief cenler. Clean-up performed by KIES Construction cost 6156.789.60. Invoice from KISS Consirucilon is inciuned m •»»«» up Do Not Scan".

p/^l_ Environmental Safety Corporatiofi PAL Environrrienla! Safety Corporation was relRirwd by |iCA k> «■<*>»»«} viwtor and Interior clean up of PS 234. Dust and debris within the building was considered to be poientiwliy co»iu>nwM»»«f aatipiiios. Interior remediation of the facility was performed in accordance to AHERA regulations. Scope of work 0AL hx the interior remediation included labor, materials, equipment. OSHA monitoring and waste disposals. Man hfi> tw*,! *>> W» power washing of the exterior of the building with gas pressure washers. Work was performed as a uon'<i»(«M«M Mxtwwiy maierial clean-up because emissions and exposure during the activity would be minimal because the operauon w»» th »*» environment. Interior and exterior cleaning performed by PAL Environmental cost $465,620.66. invoice Horn f*A}, h kKiuded in "Back Up Do Not Scan".

Citywide Environmental Services. LLC Citywide Environmental Services. LLC was lolouiefl try II* HUAC system in PS 234. This was performed to remove all dust and debris potentially coniaminalea wiin B«l».kM vW eHreelos containing material to spread throughout the building. All work performed under this coniracl wBi In bi,<..<**.. kt A><»1A rkgulellons. Costs associated with HVAC cleaning performed by Citywide Environmental was $371.530,66 Rbsi ShwoiMiwinlBl is included in "Back Up Do Not Scan".

Corinthian Construction Corinthian Construction was retained Io leiiiov* M SkMI Ironi the roof of the building. Because of the Tine particulate of the dust, all stones and insulation were renioved Irrun Pie Snell IP Pllx** the tool membrane. The roof membrane was washed thoroughly ol all dust and debris, and new inslallolion, Intel We* e4»i Hreie were replaced to its state prior to the event. Roof cleaning conducted by Corinthian cost $159,600.00. Invoice from Ci»vKii)»n > Insluoed In "Back Up Do No1 Scan".

Taylor Environmental Group. Jnc, During the clean-up and remeCietion projeci al hfc 043*^ Invironmentel Group, Inc. was retained to conduct quality control asbestos project monitoring and analytical MXvttM WJbj io the collection of TEW air samples, Taylor Environmental conducted visual inspections to identify if there was a prewenc* pl fuvt >rw debris. Quality control air monitoring and analytical services provided by Taylor Environmental totaled $2,100-00 1#ykH Environmental is included in “Back Up Do Not Scan’.

Warren & Panzer EnQinaers Warren S Panzer Engineers condueltd BpgrwM f».»Mnplihp ol fhe basement, 1st floor, 2nd floor, 3rd floor, the mechanical room and the ventilation system ol PS 234. Ttm unviM rwyr-O tor Imnsmission electron microscopy (TEM). Work performed by Warren and Panzer total $71,610.34. A coth O't*W ***«*« •w "“rk pertormed by Warren & Panzer Engineers was rol obtained from EGA.

TDX-Becom Joint Venture The TDX-Becom Joint Venture wn, Iplnkwrl in 0^ Ki imrlnrm construction management and oversight duties at P.S. 234 tc cooidinaif the contractual duller aud ic. nwu.. K»i wer iwduimed by coniractors met the proposed scope of work and professional quality. T DX-bteom was also ipsixiii.mbu K' kwiW. riwi |)« wuik ptnoimeo adlieieO to ANERA lecuialioni COEIS associaleo with construction managemenl and lnx(ioclioii Ir, H>Mww<io, (oUiled $36,730.23. Invoice from TDX/Becom is included in "Back Up Do Not Scan".

PREPARED BY; Dan Monin Wicer FEMA Form aO-BlA. SEP 06

CITY_21MC100_007213894

NYC-WTC_000359488

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000359488Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

FEMA Project Worksheet · page 2

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similarity score 0.979 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000243504

FEMA declaration/project worksheet for WTC asbestos regulations and materials.

Similar indexed content

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similar indexed content

Compare copies and versions →