NYC-WTC_000356979
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document U.T3Y kJ f •- Uuc
5
GENERAL EXCEPTIONS: RE: ALL WORK REQUIRING STREET EXCAVATIONS i i i Due to the possibility of underground utilities, e.xisting water mains, pipe lines, fiber optic cables, telephone lines, relocation & replacement of existing gas mains, conduit ducts, rock excavation, dewatering removal of existing soil determined" NOT SUITABLE FOR BACKFILL" by the NYCDOT or NYCDEP and fumishmg suitable soil, contaminated soil removal & disposal, etc., we hereby take exception to and accept absolutely no responsibility for the cost of relocating these utilities and performing any additional work in order to perform the installation required by our contract. We will however, cooperate in every way with the governing utility to negotiate an amicable means for these utilities to be relocated by their forces, or by our forces subsequent to an agreed change order in writing prior to beginning any additional work.
Dewatering and rock excavation if required is not included in this proposal and if required will be performed by our forces and paid for on a time and materials basis or another method acceptable to both parties.
In the event a change order is required and can not be negotiated at the time it is discovered and we are required to close up any excavations, there will be an additional charge for remobiJization of o ur forces when an agreed change order has been signed both parties.Please be aware the job will not continue ijntil the additional work authorization is signed.
Contractor: ICC CONSTRUCTION CORPORATION Contractor Signature; David Cannizzaro ~ Print Name & Title; David Camizzaro/Prcsidcnt Date:
Agreed & Accepted by: Print Name & Title; Date:
CITY_2 IMCl Li U_U U 1 7 9 3 2 2 8 NYC-WTC_000356979
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000339431
General exceptions regarding utilities relocation and backfill responsibilities in street work.
1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432244
Contractor notes on utilities relocation and backfill obligations.
1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432245
Notices of exceptions and responsibility limits for utility work.
1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267329
General exceptions and scope exclusions for street excavations and utilities coordination.
1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356980
Bid to perform materials and labor for listed World Trade Center works.
1 shared topics · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388930
Proposed scope of maintenance work at World Trade Center site areas, including playgrounds, courts, railing, and roadway.
1 shared topics · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
1 shared topics · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386478
Project work order for World Trade Center water analyses and related tasks.
1 shared topics · similarity 0.925
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267052
JCC Construction Corp. proposal to perform specified site work for World Trade Center Recovery.
1 shared topics · similarity 0.925
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000205169
Proposal from JCC Construction Corp to remove and replace sand in the World Trade Center recovery site playground area dated May 2002.
1 shared topics · similarity 0.925
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388924
Contract proposal from JCC Construction for WTC Recovery project refurbishment works.
1 shared topics · similarity 0.925
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000205169
Proposal from JCC Construction Corp to remove and replace sand in the World Trade Center recovery site playground area dated May 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388930
Proposed scope of maintenance work at World Trade Center site areas, including playgrounds, courts, railing, and roadway.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386478
Project work order for World Trade Center water analyses and related tasks.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267292
Contractor proposal detailing scope of work for playgrounds, pier railing, and site areas.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251944
Proposal outlining scope of work for WTC Recovery project tasks (playground, sand, railing, etc.).
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000339431
General exceptions regarding utilities relocation and backfill responsibilities in street work.
Similar indexed content
NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
Similar indexed content
NYC-WTC_000432244
Contractor notes on utilities relocation and backfill obligations.
Similar indexed content
NYC-WTC_000432245
Notices of exceptions and responsibility limits for utility work.
Similar indexed content
NYC-WTC_000267329
General exceptions and scope exclusions for street excavations and utilities coordination.
Similar indexed content