World Trade Center Recovery project – scope

Machine-extracted title · confidence 40%

Proposal outlining scope of work for WTC Recovery project tasks (playground, sand, railing, etc.).

NYC-WTC_000251944–000251946
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document I

GENERAL EXCEPTIONS: RE: ALL WORK REQUIRING STREET EXCAVATIONS.

Due to the possibility of underground utilities, existing water mains, pipe lines, fiber optic cables, telephone lines, relocation & replacement of existing gas mains, conduit ducts, rock excavation, dewatering removal of existing soil determined " NOT SUITABLE FOR BACKFILL" by the NA’'CDOT or NYCDEP and furnishing suitable soil, contaminated soil removal & disposal, etc., we hereby take exception to and accept absolutely no responsibility for the cost of relocating these utilities and performing any additional work in order to perform the installation required by our contract. We will however, cooperate in every way with the governing utility to negotiate an amicable means for these utilities to be relocated by their forces, or by our forces subsequent to an agreed change order in writing prior to beginning any additional work.

Dewatering and rock excavation if required is not included in this proposal and if required will be performed by our forces and paid for on a time and materials basis or another method acceptable to both parties.

In the event a change order is required and can not be negotiated at the time it is discovered and we are required to close up any excavations, there wil l be an additional charge for remobilization of our forces when an agreed change order has been signed both parlies,Please be aware the job will not continue until the additional work authorization is signed.

Contractor: jcc coH§yRUcnoN corporation Contractor Signature: David Cannizzaro Print Name & Title: David Camizuaro/PrcsidcBT Dare:

Agreed & Accepted by; Print Name & Title: Date;

CITY_21 MCI 00_014566245

NYC-WTC_000251946

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251946Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000290803

Proposal to remove/replace sand and soil, railing, and other improvements at World Trade Center Recovery project.