PO/Contract: World Trade Center recovery works

Machine-extracted title · confidence 41%

Formal proposal for materials and labor to World Trade Center recovery areas (playground, etc.).

NYC-WTC_000280176–000280178
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document (-1 I ' CJtL.

Proposal Date: May 7.2002__________________ JCC CONSTRUCTION CORP. To: BOVIS/AMEC ALLIANCE 24-02 39TH AVENUE 200 VESSEY ST.- 30TH FLOOR LONG ISLAND CITY, NY 11101 City, State, Zip: NEW YORK, NY iooo9 PHONE: (718)482-9600 Attention: MR. LEONARD RUONE-PROJ. M FAX:(718)482-16]6 Project name; WORLD TRADE CENTER RECOVERY We propose to funiish all material and perform all labor necessary to complete the following:

1. Remove and replace sand in playground area.

2. Remove and replace sand in volleyball court area.

3. Remove top 6" of sol in bocce conn area.

4- Replace damaged rar I mg along pier 25. Remove and replace all woigd top handrails, power wash entire railing and replace 1 I damage curb as needed.

5 Excavate and remove temporary asphalt roadway. E.xcavalc and remove all gravel under temporary roadway. Excavate md and remove of soil beneath gravel to elevation equal to bottom of the adjacent pavnng stone (between N. Moore St & School).

6. Remove debris, patch as needed bike path, Pamt lines as required to match die cxisiing bike path.

' Eliminate all power washing.

ALTERN.4TES

r 1.) Adjust utihry iame and cover total 11 @S 4,000.00 ea.

2.) Water for dust control nor included.

3.) Asphalt restoration or patching not included.

4.) Payment and Performance bond is not included in the base bid price.

I, We propose to furnish material and labor, complete in accordance with above specifications, for (he I sum of: Three HundredNinety Seven Thousand two Hundred Dollars db No Cents (5397,200.00)

Payments to be made as follows;

Concractor's signaiure; David Cannizzaro/President

Acctpiiince of proposal - The above price, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above.

Owner's signature: Date:

i'

CITY_21MC1OO_OO8129853 NYC-WTC_000280176

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280176Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000251944

Proposal outlining scope of work for WTC Recovery project tasks (playground, sand, railing, etc.).

Similar indexed content

Compare copies and versions →