NYC-WTC_000281321
Proposal to furnish materials and labor for site work at World Trade Center recovery.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗Contractor proposal detailing scope of work for playgrounds, pier railing, and site areas.
NYC-WTC_000267292–000267294OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GENERAL EXCEPTIONS; RE: ALL WORK REQUIRING STREET EXCAVATIONS.
Due to the possibility of underground utilities, existing water mains, pipe Lines, liber optic cables, telephone lines, relocation & replacement of existing gas mains, conduit ducts, rock excavation, dewatering removal of existing soil determined " NOT SUITABLE FOR BACKFILL” by the NYCDOT or NYCDEP and famishing suitable soil, contaminated soil removal & disposal, etc., we hereby take exception to and accept absolutely no responsibility for the cost of relocating these utilitie: and performing any additional work in order to perform the installation required by our contract. We will however, cooperate in every way with the governing utility to negotiate an amicable means for the: utilities to be relocated by their forces, or by our forces subsequent to an agreed change order in writing prior to beginning any additional work.
Dewatering and rock excavation if required is not included in this proposal and if required wiU be performed by our forces and paid for on a time and materials basis or another method acceptable to both parties.
In the event a change order is required and can not be negotiated at the time it is discovered and we art required to close up any excavations, there will be an additional charge for remobilization of our tbrces when an agreed change order has been signed both parties.Please be aware the job will not continue until the additional work authorization is signed.
Contractor: ICC CONSTRUCTION CORPORATION Contractor SignaUire; JJaviCl Cannizzafo Print Name & Title: David Caimizzaro/President Date:
Agreed & Accepted by: Print Name & Title; Date:
CITY_21MC100_008159067
NYC-WTC_000267293
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000281321
Proposal to furnish materials and labor for site work at World Trade Center recovery.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251947
Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000208642
Proposal by JCC Construction Corp to remove contaminated soil and repair playground and pier facilities at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356664
Document proposing scope of works for WTC site including sand replacement and railing repair.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267055
Scope of work for playground, sand, soil removal, railing, and other sitework at WTC site.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356814
Project scope for playground, court, roofing, railing, and roadway work at WTC site.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251956
Proposal to furnish materials and labor for site improvements at World Trade Center Recovery project (play areas, railing, surfaces).
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388930
Proposed scope of maintenance work at World Trade Center site areas, including playgrounds, courts, railing, and roadway.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280179
Project scope for restoration tasks at World Trade Center site, including sand replacement and railing work.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388924
Contract proposal from JCC Construction for WTC Recovery project refurbishment works.
1 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290806
Material and labor proposal for WTC Recovery project scope items.
1 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000339431
General exceptions regarding utilities relocation and backfill responsibilities in street work.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251947
Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281321
Proposal to furnish materials and labor for site work at World Trade Center recovery.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280179
Project scope for restoration tasks at World Trade Center site, including sand replacement and railing work.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356979
Contractor adopts no responsibility for utility relocation costs; notes conditions.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356811
Proposal to perform site work: sand, soil, railing, and roadway work at WTC site.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000281321
Proposal to furnish materials and labor for site work at World Trade Center recovery.
Similar indexed content
Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.
Similar indexed content
NYC-WTC_000208642
Proposal by JCC Construction Corp to remove contaminated soil and repair playground and pier facilities at the World Trade Center site.
Similar indexed content
NYC-WTC_000356664
Document proposing scope of works for WTC site including sand replacement and railing repair.
Similar indexed content
Scope of work for playground, sand, soil removal, railing, and other sitework at WTC site.
Similar indexed content