NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 24 pages

Permit application: NYC-WTC project, 14 Wall Street

Machine-extracted title · confidence 46%

Application prepared for project at 14 Wall Street related to WTC work.

NYC-WTC_000348464–000348487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Specifications - 130 Liberty, North Side

TABLE OF CONTENTS

1, PROJECT INFORMATION 1 2. SCOPE OF WORK ,2 2.1 ASBESTOS-CONTAINING MATERIALS TO BE ABATED............................. .2 2.2 FULL-CONTAINMENT WORKSITE PROCEDURES....................................... ,4 2.3 FULL CONTAINMENT WORKER AND WASTE DECONTAMINATION FACILITIES.............................................. ...................................................................... 5 2.4 PRE-CLEANING REQUIREMENTS................. .. .. . 5 2.5 PARTITIONS........................ ................................................................................... 6 2.6 PLASTICIZING......................................................................................................... 6 2.7 ENGINEERING CONTROLS.................................................................................. ,6 2.8 PROJECT PHASING............................................................................................... ,7 2.9 WORKER PROTECTION................................................................ ....................... 7 2.10 DISPOSAL REQUIREMENTS.............................................................................. ,8 2.11 AMBIENT AIR MONITORING............................................................................ ,8 2.12 WORK AREA CLEARANCE................................................................................ 7 2.13 PREVENTION OF RECONTAMINATION........................................................ .9 3. GENERAL CONDITIONS............................................................................................. .9 4. MATERIALS AND EQUIPMENT......... 10 5. CONTRACTOR’S RESPONSIBILITIES 12 6. BIDDING REQUIREMENTS 14 7. INDEMNIFICATION............. 14 8. BID FORM 15

APPENDIX

'(loo rs acsQ ^0 rioot-s d <2 Con CI € valors

i

CITY_DEP_WORBY_CANNATA_SUBP_000031407

NYC-WTC_000348466

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000348466Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →