NYC 9/11 Public Portal Document
Asbestos Abatement Technical Specifications
For 130 Cedar Street, New York, NY
Table of Contents (cont.)
is SECTION SIX: TEMPORARY FACILITIES AND EXPOSURE CONTROLS
1.0 Temporary Facilities, Controls, Offices 35
2.0 Temporary Exposure Controls 35
SECTION SEVEN: METHODS OF REMOVAL
1.0 Materials and Equipment 37
2.0 Work Area Preparation (Full Enclosure Containment) 38
3.0 Floor Preparation 39
4.0 Wall Preparation 40
5.0 Enclosure System and Controls 40
6.0 Critical Barrier and Installation 40
7.0 HVAC Ductwork 41
8.0 Light Fixtures 41
9.0 Asbestos Containing Material Removal 42
10.0 General Cleaning Procedures 55
11.0 Final Cleaning Procedures 55
SECTION EIGHT: PROCEDURES FOR DISPOSAL OF WASTE
1.0 Disposal Activities 56
2.0 Maintenance of Work Place Barriers and Work
Decontamination Enclosure System 56
3.0 Asbestos Waste Requirements 56
SECTION NINE: AIR MONITORING, TESTING, AND INSPECTIONS
1.0 Inspection and Testing 59
2.0 Personal (OSHA) Monitoring 59
3.0 Monitoring Requirements 59
4.0 Final Clearance Air Monitoring 60
5.0 Certificate of Completion 71
SECTION TEN: ASBESTOS QUANTITY SCHEDULES
ATTACHMENT A: ASBESTOS ABATEMENT DRAWINGS
ATTACHMENT B WINDOW AND SPANDREL QUANTITY SPREADSHEET
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 3
NYC-WTC 000125581