Asbestos Abatement Technical Specifications
For 130 Cedar Street, New York, NY
ASBESTOS ABATEMENT TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
SECTION ONE: SCOPE OF WORK
1.0 Description of the Work 5
2.0 Work Summary 5
3.0 Sequence of Work 5
4.0 Special Conditions 6
SECTION TWO: GENERAL CONDITIONS
1.0 Requirements 7
2.0 Definitions 8
3.0 Applicable Standards and Guidelines 14
4.0 Work Procedures 14
5.0 Personnel Qualifications 18
6.0 Owner(s) Responsibilities 20
7.0 Responsibilities of the Environmental Consultants 20
8.0 Air Monitoring 21
9.0 Disposal of Asbestos Containing Waste 21
10.0 Contract Close Out 22
11.0 Authority to Stop Work 23
•
SECTION THREE: EXECUTION
1.0 Pre-Construction Meeting 23
2.0 Progress Meetings and Submittals During Work 25
3.0 Standard Operating Procedures 25
4.0 Notification, Variance, Permits, Warning Sign 26
Labels, and Posters
5.0 Emergency Precautions 27
6.0 Emergency Planning 27
7.0 Fire Protection 28
SECTION FOUR: REQUIREMENTS FOR PROTECTIVE EQUIPMENT
1.0 Respiratory Protection 29
2.0 Personal Protective Equipment 31
SECTION FIVE: DECONTAMINATION ENCLOSURE SYSTEM
1.0 Construction of Decontamination Enclosure System (DES) 38
2.0 Work Place Entry and Exit Procedures 40
3.0 Waste Container Pass-Out Procedures 41
•
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 2