NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 31/Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church
Document / 21 pages

Asbestos project notification form for NYC DEP

Machine-extracted title · confidence 95%

Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.

NYC-WTC_000154680–000154700

Folder label: “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church

Page image
Scanned page image, NYC-WTC_000154683
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Specifications - 130 Liberty, North Side

TABLE OF CONTENTS

1. PROJECT INFORMATION I 2. SCOPE OF WORK 2 2.1 ASBESTOS-CONTAINING MATERIALS TO BE ABATED............................ 2 2.2 FULL-CONTAINMENT WORKSITE PROCEDURES....................................... 4 2.3 FULL CONTAINMENT WORKER AND WASTE DECONTAMINATION FACILITIES................................................................................................................. 5 2.4 PRE-CLEANING REQUIREMENTS................................................................... 5 2.5 PARTITIONS........................................................................................................ 6 2.6 PLASTICIZING..................................................................................................... 6 2.7 ENGINEERING CONTROLS............................................................................... 6 2.8 PROJECT PHASING............................................................................................ 7 2.9 WORKER PROTECTION.................................................................................... 7 2.10 DISPOSAL REQUIREMENTS........................................................................... 7 2.11 AMBIENT AIR MONITORING......................................................................... 8 2.12 WORK AREA CLEARANCE............................................................................ 7 2.13 PREVENTION OF RECONTAMINATION....................................................... 9 3. GENERAL CONDITIONS........................................................................................... 9 4. MATERIALS AND EQUIPMENT 10 5. CONTRACTOR’S RESPONSIBILITIES 12

APPENDIX A: PROJECT DRAWINGS

$7

1

NYC-WTC_000154683

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154683Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →