NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 24 pages

Permit application: NYC-WTC project, 14 Wall Street

Machine-extracted title · confidence 46%

Application prepared for project at 14 Wall Street related to WTC work.

NYC-WTC_000348464–000348487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Specifications ~ 130 Liberty, North Side

All equipment and scaffolding used shall comply with the most recent safety standard and be OSHA approved.

The Client assumes no responsibility responsible for any mis-interpretations in contractors estimating and bidding.

6. BIDDING REQUIREMENTS In order to qualify for bid, the Abatement Contractor must attend the pre-bid meeting and site inspection. The Abatement Contractor must also review specifications and attachments of the contract to:

A. Verify all field conditions and dimensions at the job site.

B. Ascertain the nature and location of the work.

C. Familiarize himself with the conditions involved with transport, handling, storage and disposal of the materials.

D. Ascertain the availability and sources of water and electric power or include modification as required to make acceptable.

E. Ascertain and provide the amount and type of equipment needed to complete the job safely (i.e. air filtration units, HEPA vacuums, polyethylene sheeting, safety equipment, etc.).

F. Familiarize himself with the building’s security procedures.

G. Ascertain and submit required insurance to the Client.

-------- T^INDEMNIEIGATIQN The Abatement Contractor shall defend, indemnify and hold harmless the Client, its agents and employees of and from any and all claims, damages, losses, expenses (including legal fees), actions or causes of actions, arising out of, under or in connection with the performance of the work required herein.

The Client assumes no responsibility for any conclusions or interpretations made by the Abatement Contractor based upon the information supplied by the Client or the Environmental Consultant.

a:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec.doc 15

1

C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000031423

NYC-WTC_000348482

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000348482Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →