NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection report, 45 Street Annex, Jan 2001

Machine-extracted title · confidence 32%

Asbestos inspection record with sample numbers, site details and inspector identity redacted.

NYC-WTC_000341030
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• ‘ ASBESTOS INSPECTION REPORT PAGE 1 OF 1 PREMISE ADDRESS Maiden Lane (Federal Reserve Annex) ZIP ^RO CODE BLOCK LOT Ws SQUAD 1 BADGE#AO78

PHOTOS TAKEN Yes INSPECTOR R. RAMMOHAN BLDG . TYPE f BASIS OF INSPECTION TRUI 303 0'2-

Tno'^Beslos kemoval Corp. SAMPLE NO.—-

ISPKIJ129 Street Collegei’oint SAMPLENO.' SAMPLE NO. 1856 (W61-41O0 Wan^^'l^anzer Engineers P.C. gWI^IservcBank

45 Street NewVork ^S^Jaijerty Street New'^^rk iW® kSTi? (2’1'5^^22-0077 loflbs (2{5T^22-5535 CONTACT PERSON Jolui BumS TIME OF INSPECTION FROM: 8am - 8pm

INSPECTION DISCLOSED: 8/12/02 (Monday) ; Jan Wolkowicz and 6 handlers arrived on site and mobilization began. Until 11 am Warren & Panzer Project Monitor was not on site. I spoke to Steve Parmagiani and Joseph Bonder of Trio and they claimed that they had informed W&P of the 8/12/02 schedule of 95 Maiden Lane. The handlers were sent home after building the decon and setup of water and electric. 8/13/02 (Tuesday): Jan Wolkowicz and 7 Handlers & Dipo Elemez of Warren&Fanzer. The Project monitor showed up onsite with only two air sampling pumps. He claimed that he was instructed by Benny of W&P to gather pumps at 45 Wall Street and could not able to locate the pumps. Then Dipo went to Ann Street and gathered 4 more pumps and began sampling. South east wing of the roof gravel washing was completed and midsouth section was ongoing at the end of the day. 8/14/02 (Wednesday): Jan Wolkowicz and 7 handlers & Dipo Elemez of Warren&Panzer were on site. Roof gravel washing was ongoing all day. 8/15/02 ( Thursday): Jan and 7 handlers & Dipo of W&P were on site. Roof gravel washing continued. 8/16/02 (Friday): Jan and 7 handlers & Dipo of W&P were on site. Gravel washing on bulkhead roof started. At 2:30 pm all bulkhead roofs were completed and visual inspection was satisfactory. Crew began double bagging the waste bags. Approximately 800 bags were generated. All washing was completed and bagout to continue on the next day(8/17/02

Project completed.

NOV# INFRACTIONS RESULT CODE 5 NOV# SUfERVlSOftSlNtriALS w*. yORO 1 ■■ MANHATT Qi jBiwjr JOHWlVLi 1 'UEENS 5* = STAl EN ISLAi

BLDG. TYPE A>6 STORIES B<6 STORIES C SINGLE FAMILY D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY RESULT CODES 1 - Violation Issued 2 = No Violadon Issued 3 = No access 4 = Project not Started (no NOV) 5 = Public Owned Property ACP3093

fO

CITY_21MC100_009276353

NYC-WTC_000341030

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000341030Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →