NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 13 pages

World Trade Dust Cleaning Work Plan Draft

Machine-extracted title · confidence 38%

Draft scope of work for WTC dust cleaning and related regulatory alignment.

NYC-WTC_000332061–000332073
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

This determination is to be made based on the descriptions included in the Cleaning Contract Scope of Work and best professional judgement. Deliverables

All deliverables shall be provided in the EPA Indoor Air web database via F2L or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity. The Project Monitor shall record all pre-cleaning and pre-sampling inspecj It information in the EPA Indoor Air database or using.aiLagreed-Hpf tnni is information shall include, but is not limited to, Exterior evaluati'igp (pass' of HVAC system (central, individual or none), HVAC impactedTV/N occupanT ^), written access obtained (Y/N), space occupied (Y/N), dust present hw/high), ent (Y/N), pcehttg /flaking/chalking paint present (Y/N), AC| preseni C residential'use (commercial/residential), residents with special ni ids, cleaning methodKSuipe \ ..rB). Dates and times shall be associated with all activity s including start and finish date.

8. In the event that mold is observed on building Us, support beams, ceiling tiles, HVAC systems) in area where work has* en request he Monitoring Contractor will notify EPA and contact the NYCDOH ai 2-442-S r assistance in evaluating potential hazard to woikers. Cleaning w 111 not p in are: jWe mold is observed until potential hazards are evaluated and addressed i

Deliverables

The Project Monitor shall record if ^Id is pre^nt and notify the NYCDOH and EPA. This information shall be providcd .yia EPA Indoor Air web database or an agreed upon alternative electroniuformat or website approved by EPA within 24 hours of activity.

9. t that suspe .CM or flaking, peeling or chalking paint is observed, the Mohit Contractor^ fc EPA. Cleaning will not proceed in areas where suspected ACM king, peelini diking paint is observed until instructed otherwise.

Deliveral

The Project Monitor shall record if suspected ACM or flaking, peeling or chalking lead/ based is obsen ed and notify EPA. This information shall be provided via EPA Indoor Air 4 web database or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

rhe MdPiioring Contractor shall evaluate all HVAC systems in all residential buildings where cleaning will take place to determine if these systems have been impacted by dust or debris from the collapse of the World Trade Center and if these systems require cleaning. a. In cases where cleaning is requested for an individual residence, portions of the HVAC system dedicated to that residence will be evaluated.

5

CITY_21MC100_004089192

NYC-WTC_000332065

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000332065Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140537 · Box DEP Box 05

Draft scope of work document detailing compliance requirements and procedures for residential cleaning and air sampling south of Canal Street.

Similar indexed content

Compare copies and versions →