NYC 9/11 Public Portal Document
b. In cases where cleaning is requested for a whole building, the building’s HVAC
system will be evaluated as a whole.
e. HVAC assessments shall be conducted in accordance with the National Air Duct
Cleaners Association (NADCA) General Specification for the Cleaning of X
Commercial Heating, Ventilating and Air Conditioning Systems and the NADCA^
Assessment, Cleaning and Restoration Standard (ACR 2002).
d. The results of the whole building HVAC system evaluations shall b; ocumcnted in
a letter report. This report shall be provided to DEP and wil business days
of the completion of the evaluation. This report j nal inci ide the name and
qualifications of inspector, date of inspection building I description of tte
HVAC system, the basis for the detcrmining wbether or -lem vas impacted
by the collapse of the WTC and if the system requires eanii
Deliverables
The Project Monitor shall record if the HVAC sy^ in impacted by dust or debris
fi-om the collapse of the WTC, if the HVAC. |,een evaluated and cleaned
subsequent to September 11,2001(if yes, then 5^ an<i u on »and if the HVAC system
requires cleaning. This information shall b< pnix a i viaF2I or an agreed upon alternative
electronic format or website approved hs 1 P \ v 24 ho' •s of activity.
11. HVAC systems that have been impacted b^A^ ch is hl n the collapse of the World
Trade Center will be cleaned. In ihe event that a HV. ' systcn I for an entire building requires ,
cleaning, a separate, site spi : contract will be to ■ded by DEP for this work. If only a'n
portion of a HVAC system, ires diffing, then the cleaning contractor will conduct the ‘j" V,
cleaning utilizing specializTO labor led and expenenced in duct cleaning.
a. The monitori [tractor s| chedule and oversee the cleaning of HVAC systems.
b, leMom ntractorl inspect HVAC systems or portions thereof cleaned
ifycl T visiblc'dust or other contaminants are evident through visual
ionoric-unt K-n 'he Monitoring Contractor will direct the HVAC cleaning
:tor to rSean )se poi tions of the system where dust or other contaminants are
. .itiii reinspe
c., HVAC cl inmg. and cleanliness inspections shall be conducted in accordance with
the Natio 1 \ii Duct Cleaners Association (NADCA) General Specification for the
Cleaning ' Commercial Heating, Ventilating and Air Conditioning Systems and the
NADC^ .ssessment. Cleaning and Restoration Standard (ACR 2002).
Sampling of residences and common spaces where cleaning has not been requested
a. Based on consultation with resident, aggressive or modified aggressive air sampling
Will be conducted. Residents shall not be present in their residence during aggressive
air sampling activities.
i. Before beginning aggressive air sampling, a 1 horsepower electric leaf blower
shall be used to direct exhaust air against walls, ceilings, floors and other
surfaces. This shall continue for at least five minutes per 1,000 square feet
6
CITY_21MC1OO_OO4O89193
NYC-WTC_000332066
OCR can misread numbers and units. Confirm readings against the page image before using them.