NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 13 pages

NYC-WTC_000209480

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000209480–000209492
Page image
Scanned page image, NYC-WTC_000209484
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Cleaning Contract Scope of Work (i.e. Scope A or B) to be implemented. This determination is to be made based on the descriptions included in the Cleaning Contract Scope of Work and best professional judgement. Deliverables

All deliverables shall be provided in the EP A Indoor Air web database via F2L or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity. The Project Monitor shall record all pre-cleaning and pre-sampling inspection information in the EPA Indoor Air database or using an agreed upon electronic format. This information shall include, but is not limited to, exterior evaluation (p<iss/fail), type ofHVAC system (central, individual or none), HVAC impacted (Y/N), occupant present (Y/N), written access obtained (Y/N), space occupied (Y/N), dust present (low/high), mold present (Y/N), peeling /flaking/chalking paint present (Y/N), ACM present (Y/N) residenti al use (commercial/residential), residents with special needs, cleaning method (Scope A or B). Dates and times shall be associated with all activities including start and finish date.

3. In the event that mold is observed on building components (walls, support beams, ceiling tiles, HVAC systems) in area where work has been requested, the Monitoring Contractor will notify EPA and contact the NYCDOH at 212-442-3372 for assistance in evaluating potential hazard to workers. Cleaning will not proceed in areas where mold is observed until potential hazards are evaluated and addressed if necessary.

Deliverables

The Project Monitor shall record if mold is present and notify the NYCDOH and EPA. This information shall be provided via EPA Indoor Air web database or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

4. In the eventthat suspected ACM or flaking , peeling or chalking paint is observed, the Monitoring Contractor will notify EPA. Cleaning will not proceed in areas where suspected ACM or flaking, peeling or chalking paint is observed until instructed otherwise.

Deliverables

The Proj ect Monitor shall record if suspected ACM or flaking, peeling or chalking lead based is observed and notify EPA. This information shall be provided via EPA Indoor Air web database or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

5. The Monitoring Contractor shall evaluate: all HVAC systems in all residential buildings where cleaning will take place to determine if these systems have been impacted by dust or debris from

5

CITY_21MC100_000439009 NYC-WTC_000209484

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000209484Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140537 · Box DEP Box 05

Draft scope of work document detailing compliance requirements and procedures for residential cleaning and air sampling south of Canal Street.

Similar indexed content

Compare copies and versions →