NYC 9/11 Public Portal Document
The Project Monitor shall direct and coordinate all services and report all findings to EPA. The scope
of this project will be as follows:
6. The Project Monitor shall be responsible for accessing a secure EPA Website (url, user name
and password to be provided by EPA) to obtain requestor information (address, building
identification numbers, etc.). In coordination with the EPA, the Project Monitor will access
residential services requested from the Website and schedule cleaningf activities and air
sampling with the tenants/owners, asbestos abatement contr; •rs ad' air monitoring
technicians for the various residences. The ProjeckMonitoa :n supply relevant
information on activities for the EPA Indoor Air dal ascviatl gA website.
to be input may include, but is not limited to st^ id comp s for the cleaning,
sampling dates and sample identification nimbi Alic :a sJ as
confidential. BBlSsS
Deliverable
The Project Monitor shall provide validated addresses and ing information into the
EPA Indoor Air web database via F2L or ai' uaiced upon electronic format or
website approved by EPA within 24 hj
' . tjy A’ -
7. The Project Monitor will scheduL and conduetpn ianing or pre-sampling inspections of H e
the residences, common spa< land he^pg, v< lation and air conditioning systems' ■ V'
(HVAC) based on the requests assist«e from vidual residents and building owners
made through the DEP/EPA h iline.
a. Residents will Iw provided a tact sheet and information prepared by EPA
regarding samptin g option; res si VC and modified aggressive air sampling
protocol^ nd ilu 1 .andlingc able personal items (money, jewelry, heirlooms.
etc J and fragile ob Js during work.
b. The Pioject Moniti kvill obtain written authorization for access and all work to be
peril mice [Le including inspection, sampling and cleaning of residences,
vtinnioi •'pjces ani lYAC systems using the Access Agreement (to be provided).
c. the hor Will advise EPA if any of the following conditions are observed:
i. sjdential and commercial use within a building; . 9
ii. d^ or debris in common spaces;
iii. tb^ presence of mold on building components (walls, support beams, ceiling
«es, HVAC systems); the presence of peeling, flaking or chalking (lead;
the presence of potential asbestos-type insulation (e.g., fibrous materials);
residents with special needs; or
vi. other circumstances that may require deviation from the procedures specified
in the scopes of work for the cleaning and monitoring contracts.
d. In consultation with EPA, the Project Monitor will make a determination of the
appropriate Cleaning Contract Scope of Work (i.e. Scope A or B) to be implemented.
4
CITY_21MC1OO_OO4O89191
NYC-WTC_000332064
OCR can misread numbers and units. Confirm readings against the page image before using them.