The Project Monitor shall direct and coordinate all services and report all findings to EPA. The scope of
this project will be as follows:
1. The Project Monitor shall be responsible for accessing a secure EPA Website (url, user name and
password to be provided by EPA) to obtain requestor information (address, building identification
numbers, etc.). In coordination with the EPA, the Project Monitor will access residential services
requested from the Website and schedule cleaning activities and air sampling with the
tenants/owners, asbestos abatement contractors and air monitoring technicians for the various
residences. The Project Monitor will then supply relevant information on activities for the EPA
Indoor Air database via the secure EPA website. Data to be input may include, but is not limited
to start and completion dates for the cleaning, sampling dates and sample identification numbers.
All data shall be maintained as confidential.
Deliverable
The Proj ect Monitor shall provide validated addresses and scheduling information into the EPA
Indoor Air web database via F2L or an agreed upon alternative electronic format or website
approved by EPA within 24 hours of activity.
2. The Proj ect Monitor will schedule and conduct pre-cleaning or pre-sampling inspections ofthe
residences, common spaces and heating, ventilation and air conditioning systems (HVAC) based
on the requests for assistance from individual residents and building owners made through the
DEP/EP A hotline.
a. Residents will be provided with a feet sheet and information prepared by EPA regarding
sampling options (aggressive and modified aggressive air sampling protocols) and the
handling ofvaluable personal items (money, jewelry, heirlooms, etc.) and fragile objects
during work.
b. The Project Monitor will obtain written authorization for access and all work to be
performed for this project including inspection, sampling and cleaning ofresidences,
common spaces and HVAC systems using the Access Agreement (to be provided).
c. The Project Monitor will advise EPA if any of the following conditions are observed:
i. mixed residential and commercial use within a building;
ii. dust and/or debris in common spaces;
iii. the presence ofmold on building components (walls, support beams, ceiling tiles,
HVAC systems); the presence of peeling, flaking or chalking lead paint;
iv. the presence of potential asbestos-type insulation (e.g., fibrous materials);
V. residents with special needs; or
vi. other circumstances that may require deviation from the procedures specified in
the scopes of work for the cleaning and monitoring contracts.
d. In consultation with EPA, the Project Monitor will make a determination ofthe appropriate