NYC 9/11 Public Portal Document
AU deliverables shall be provided in the EPA Indoor Air web database via F2L or an agreed
upon alternative electronic format or website approved by EPA within 24 hours of activity.
The Project Monitor shall record all pre-cleaning and pre-sampling inspection information in
the EPA Indoor Air database or using an agreed upon electronic format. This information
shall include, but is not limited to, exterior evaluation (pass/fail), type of HVAC system
(central, individual or none), HVAC impacted (Y/N), occupant present (Y/N), written access
obtained (Y/N), space occupied (YZN), dust present (low/high), mold present (Y/N), peeling
/flaking/chalking paint present (Y/N), ACM present (Y/N) residential use
(commercial/residential), residents with special need|, cleaning method (Scope A or B).
Dates and times shall be associated with all activities including start and finish date.
...... .... BO;
3. In the event that mold is observed on building <^^ponents..:(walls,
tiles, HVAC systems) in area where work has beenrequesi ed, the Monitoring Contractor will
notify EPA and contact the NYCDOH at 212-442-3372 for assistance in evaluating potential
hazard to workers. Cleaning will not proceed in areas where mold is observed until potential
hazards are evaluated and addressed if necessary,.
Deliverables i
The Project Monitor shall record if mold is present W lOti: ytbeNYCDOHandEPA. This
information shall be provided via Ef^ Indoor Air web < or an agreed upon alternative
electronic format or website apptBYed by within iiurs of activity.
4. In the event that suspect^^CM or/flaking, p^ng or chalking paint is observed, the
Monitoring Contractor notify EPA. Cleai not proceed in areas where suspected
ACM. or flaking, pe^ chalking paint is i srved until instructed otherwise.
Deliv
The itor shall record if suspected ACM or fiaking, peeling or chalking lead
^d notify EPA. This information shall be provided via EPA Indoor Air
web dati ^^^ed uf^n alternative electronic format or website approved by EPA
.s^thin 24 hours of activity.
5 The Monitoring Contractor shall evaluate all HVAC systems in all residential buildings where
cleaning wUl place to determine if these systems have been impacted by dust or debris
fi-om the of the World Trade Center and if these systems require cleaning.
a. In cases where cleaning is requested for an individual residence, portions of the
HVAC system dedicated to that residence will be evaluated.
b In cases where cleaning is requested for a whole building, the building’s HVAC
system will be evaluated as a whole.
c. HVAC assessments shall be conducted in accordance with the National Air Duct
Cleaners Association (NADCA) General Specification for the Cleaning of
5
NYC-WTC_000139835
OCR can misread numbers and units. Confirm readings against the page image before using them.