NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 64 pages

EPA background report, WTC air contaminants, 1987

Machine-extracted title · confidence 29%

Background report on asbestos and related contaminants for WTC environment, 1987.

NYC-WTC_000318755–000318818
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I 15826 Federal Register / Vol. 52, No. 83 / Thursday, April 30, 1987 / Proposed Rules n=s aK i

, changes in the condition of the ACBM fibers/cm’). The proposed rule would course, pass an examination, and 5 ! must be added to the management plan. require persons to use the EPA/OSHA participate in continuing education. I ,' The proposed rule requires that O&M Reference Method found in Appendix A Persons can receive accreditation from a I activities, other than small-scale, short- to'40 CFR 763.121 for PCM clearance. State that has instituted an accreditation I duration activities, which disturb This method is identical to the OSHA program at least as stringent as the ! ; asbestos shall be designed and • Reference Method found at Appendix A requirements of the Model Plan. In conducted by persons accredited to do to 1929 CFR 1926.58 and very similar to addition, persons in States that have not j ! such work. (A discussion of what the NIOSH 7400 method. (OSHA’s yet developed programs at least as constitutes small-scale, short-duration rationale for adopting the method is , stringent as the Model Plan can receive projects is given Appendix B to this . found at 51 FR 22684-22692, June 20,' accreditation by passing an EPA- rule.) Finally, procedures are provided ' 1986. EPA adopts OSHA’s reasoning.) approved training course and exam that for. responding to fiber release , The proposed rule has a three-step are consistent with the Model Plan. ? episodes—the uncontrolled or process for using TEM to determine Section 206 of Title 11 of TSCA unintentional disturbance of ACBM. For successful completion of a removal requires EPA to develop a Model minor episodes (i.e., those involving 3 response action. The first step is a , Contractor Accreditation Plan by April square or linear feet of less of ACBM), careful visual inspection, as mentioned 20,1987. The plan appears as Appendix basic cleaning and containment above. The two steps that follow involve c to Subpart E. A notice issuing the plan practices for O&M staff are listed. For , a sequential evaluation of the five , appears elsewhere in this edition of the ; larger amounts, accredited personnel - samples taken inside the worksite and Federal Register. are required to respond. five samples taken outside the worksite. Both sets of samples must be taken at K. Worker and Occupant Protection i /. Completion of Response Actions the same time to ensure that Worker protection requirements for After performing a thorough visual atmospheric conditions are the same removal, encapsulation and/or inspection, air testing is used to and that the comparisons are valid. The enclosure response actions are already determine if a response action has been inside samples are analyzed first. If the in effect under the EPA worker completed. Clearance air monitoring will average concentration of the inside protection rule (40 CFR 763.121, et seq.)-, not be required for small-scale, short- samples does not exceed the limit of ' and the OSHA construction standard (29 duration projects. Phase Contrast quantitation for the TEM method CFR Subpart G). EPA’s NESHAP ; Microscopy (PCM) is allowed'for (discussed in detail in Appendix A of standard, although designed to protect response actions involving 260 linear or this proposed rule), then the removal is outdoor air, also provides incidental ; • 160 square feet or less, the amounts used considered complete. protection to workers. • to trigger removal requirements under Step three is taken if the average : EPA’s NESHAP (40 CFR Part 61, Subpart concentration of the samples taken Essentially, under proposed § 763.91, ■ M)- inside the worksite are greater than the the regulation extends coverage of ; The proposed rule requires the use of TEM limit of quantitation. In this case, EPA’s worker protection rule at 40 CFR transmission electron microscopy (TEM) an encapsulation, enclosure, or removal 763.121 to maintenance and custodial for most removal, enclosure, and response action is considered complete personnel in schools who perform O&M ; encapsulation response actions. EPA when the average of five samples taken' activities but are not covered by ,, continues to believe that TEM is the inside the worksite is not significantly OSHA’s construction standard or an method of choice for air sample analysis larger than the average of five samples ■ asbestos regulation under an OSHA because, unlike PCM, TEM analysis can ' taken outside ' 'the worksite. A statistical’ approved state plan. The EPA worker . distinguish asbestos from other fibers comparison using the Z-Test must be protection rule itself extended the same and detect the small thin fibers found at used to determine whether the two protections as this OSHA construction abatement sites. Therefore the use of averages are significantly different. (A standard to asbestos abatement workers : TEM will significantly improve the discussion on how to compare measured who are employees of state and local adequacy of cleanup and is levels of airborne asbestos with the Z- governments and who are not otherwise ■ recommende d over PCM when Test is given in Appendix A of this covered by OSHA regulation or OSHA ; available. However, due to limited proposed rule.) If the concentrations are approved state plans. This proposed rule availability of microscopes for air not significantly different, then the further extends these standards to O&M sample analysis and the cost and time response action is considered complete. workers who are LEA employees. These associated with TEM analysis, the . ' If the inside average concentration is regulations basically establish a proposed rule allows a phase-in period significantly higher, recleaning is • Permissible Exposure Limit (PEL) of 0.2 . for the TEM requirement. For 2 years required and new air samples must be fibers per cubic centimeter (f/cm’) over I after the rule becomes effective, local collected and evaluated after the an 8-hour period for abatement project ’ education agencies may choose to use worksite has been cleaned and w’orkers exposed to airborne asbestos PCM for response actions comprising ' reinspected. and an action level of 0.1 f/cm’ which ' 3,000 square or 1,000 linear feet or less. triggers a variety of worker protection For 1 year after this, LEAs may use PCM /• of Accredited Persons practices. These practices include air for clearance of projects of 1,500 square , Section 206 of Title 11 of TSCA monitoring, regulated work areas, or 500 linear feet or less. LEAs retain full requires accreditation of persons who; engineering and work practice controls, discretion to require use of TEM at any 1. Inspect for ACM in school respiratory protection and protective ; time for any project. . ' buildings. clothing, hygiene facilities and practices, The criterion for determining whether 2. Prepare management plans for such vvorker training, medical surveillance', ■ a response action is complete when schools. and recordkeeping requirements.’ using PCM will require multiple samples 3. Design or conduct response actions As an alternative, however, OSHA’s (minimum of five) with clearance with respect to friable ACM in such standard allows employers to institute i allowed only if all of the individual schools (other than O&M activities). the provisions of its Appendix G in the samples are below the limit of The Model Plan requires persons case of small-scale, short-duration I quantitation of the PCM method (0.01 seeking accreditation to take an initial projects rather than comply with the full

NYC-WTC_000318762

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318762Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →