NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 77 pages

Background study draft for WTC asbestos, 2003

Machine-extracted title · confidence 37%

Background study draft on asbestos in schools related to WTC, March 2003.

NYC-WTC_000318678–000318754
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Federal Register / Vol. 52. No. 210 / Friday, October 30, 1987 / Rules and Regulations 41839

damaged ACM. Several State attorneys However. LEAs should b” advised microscopy for the analysis of air general, among several other that in providing "a schedi., fo samples taken for clearance air commenters, contended that "(IJn case.s beginning and completing each monitoring. Comments dealt with issues of significant damage, the only preventive measure and respoiise that included the possible uses of each appropriate response is to remove the action” as required in § 763.93(e)(6). the of these analytical methods for material, as this is the only action which LEA is specifying what constitutes clearance air monitoring, as well as adequately protects human health and implementation of preventive measures issues specific to the.use of TEM. the environment." and response actions in a timely fashion The final rule sets forth TEM as the EPA disagrees that removal is the for that LEA. EPA and State analytical method to be used for only appropriate response in all cases of enforcement officials will be monitoring analysis of samples taken for clearance significantly damaged ACM. particularly LEA adherence to these schedules to air monitoring although the TEM thermal system insulation. There may determine whether enforcement actions requirement will be phased-in gradually. indeed be particular circumstances of are warranted against those schools EPA convened a committee of leading significant damage in which removal is which fail to meet their own deadlines microscopists from private and Federal both inappropriate and undesirable. for completing preventive measures and laboratories to produce an analytical EPA agrees that, particularly with response actions. protocol specific for post-abatement regard to significantly damaged friable 6. Repair for significantly damaged clearance monitoring. Each microscopist miscellaneous and surfacing ACM. friable thermal system insulation ACM. had extensive experience in TEM. isolation of the functional space and Several commenters. State attorneys scanning electron microscopy (SEM). removal is often the most appropriate general and the unions in particular. and airborne asbestos analysis. The (and possibly, only acceptable) questioned the efficacy of repair for unanimous conclusion of the response. Encapsulation, for example. significantly damaged friable thermal microscopists was that, for purposes of would be an acceptable response action system insulation ACM. clearance air monitoring, TEM was the for friable surfacing ACM only under Repair is often successful in technique of choice. Consequently, an very limited circumstances, given preventing fiber release from damaged interim TEM protocol has been current technology. However, the thermal system insulation and. after formulated for clearance air monitoring Agency will not categorically preclude assurance that it will protect human of asbestos abatement sites in schools. health and the environment, an LEA EPA chose to require analysis by TEM response actions of repair. may find repair the least burdensome for four reasons: (1) TEM is capable of encapsulation, or enclosure which. method of response. Techniques for under certain circumstances, may also measuring the smallest diameter fibers: thermal system insulation ACM repair protect human health and the (2) based on existing, validated are well-developed and easily methods, a fomial protocol has been environment. accomplished. Furthermore, the nature 5. Jmpiementation of response aclions developed: (3) TEM has been validated of the material makes it especially in a tiine/y fashion. Several commenters by intra- and inter-laboratory susceptible to quick remediation with asked the.Agency to clarify the comparisons conducted by NBS: and (4) simple techniques. requirement that appropriate response a formal laboratory accreditation EPA recognizes that severely actions be selected and implemented by program for TEM laboratories is damaged friable thermal system ACM LEAs "in a timely fashion." perhaps by currently under development by the may warrant removal to protect human establishing time limits for particular health and the environment, but this is NBS. actions. not always the case. If feasible, as Phase Contrast Microscopy (PCM) Many of the response action determined by the accredited expert, will be allowed for clearance of small provisions themselves imply timeliness and protective of human health and the projects (removal of less than 160. ft® or in response. Damaged dr significantly environment, repair may be an 260 linear feet of asbestos) and during a damaged thermal system insulation appropriate response action for this phase-in of the TEM requirement, for ACM or its covering, for example, must level of damage under particular clearance of some larger projects. This be constantly maintained in an intact circumstances. Further, new and phase-in period will give laboratories a state and undamaged condition. In emerging repair technologies may offer period of time to acquire and install addition, the rule specifies, in the case LEAs new ways to prevent fiber release. TEM instruments, and will permit of significantly damaged friable protect human health and the economical clearance of small projects surfacing or miscellaneous.ACM. that environment, and postpone the major where clearance analysis costs are a LEAs must immediately isolate the disruption often associated with significant portion of total abatement functional space and restrict access. asbestos removal projects until a more costs. unless isolation is not necessary to appropriate time. PCM analysis must be made using the protect human health and the Finally, "feasibility” does not imply, latest version of the NIOSH 7400 environment. as one commenter feared, "repair first, ' method. Two other methods of PCM The Agency does not believe it is able and only if repair is impossible, then analysis were considered: the OSHA/ to define “timely fashion" or specify remove." There is no predisposition EPA Reference Method (ORM) and time limits or deadlines in applying such toward repair, but rather a prior P&CAM 239. The ORM cannot be used requirements in all cases any better than consideration of repair feasibility as a for area clearance because it is intended it is able to prescribe a single response check to avoid a major disruption to the for personal sampling of abatement action for every particular damage material, through removal, if it is not workers during abatement work category. LEAs. in the context of necessary or desirable. clearance following an abatement particular asbestos hazards, in 7, Airborne asbestos fiber action. P&CAM 239 will not be allowed consultation with accredited experts measurement for clearance of since both NIOSH and OSHA have and in full view of school-community abatement sites. EPA has received determined that the NIOSH 7400 method groups, are responsible for determining comments on the use of transmission is more accurate and reliable. appropriate schedules for their asbestos electron microscopy (TEM). scanning The PCM method is nonspecific for response actions. electron microscopy, and phase contrast asbestos and it cannot detect the small

NYC-WTC_000318692

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318692Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →