NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
27 shared non-person entities · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Background report on asbestos and related contaminants for WTC environment, 1987.
NYC-WTC_000318755–000318818OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Federal Register / Vol. 52, No. 83 / Thursday, April 30, 1987 / Proposed Rules 15829
Determination of Asbestos in Bulk enhance the use of the management plan accredited experts to ensure that the Insulation Samples." This protocol was as an enforcement tool. LEA inspects properly for ACM in its published in the 1982 Asbestos in EPA invites comment on the buildings, develops and implements Schools Rule (40 CFR Part 763, Subpart information required in the management responsible management plans, and F) and was modified in 47 FR 38535, plan under this proposed rule and is designs and conducts all abatement September 1,1982. Laboratories interested in whether other information activity in an appropriate manner. No : performing TEM analysis must use is necessary. preference is suggested for any'
{ Appendix A of Subpart F, and Another issue discussed by the particular response action and LEAs laboratories performing PCM analysis committee was the potential for may at any time decide to remove ACM must use the EPA/OSHA Reference conflicts of interest in the relationship if that is deemed appropriate. Method found in Appendix A of 40 CFR among the management plan developer, The Agency's general position on
I 763.121, the Asbestos Abatement inspector, the persons who design or Projects: Worker Protection rule. conduct response actions and analytical asbestos in schools is that eventually it Comments are requested on the laboratories. Certain members were must be removed. That removal may following: Whether TEM should be concerned about the incentive to drive occur immediately or may only be added as an optional additional method up LEA costs if the inspector, plan appropriate at a later time, such as for bulk analysis: whether a quality developer and abatement contractor had when the asbestos becomes seriously assurance sample should be required or any financial relationship or all worked damaged. Under the NESHAP, for - suggested to allow for false positives in for the same firm. Other members felt actions such as major building bulk sample analysis; and for PCM air that in areas of the nation where the renovation, it is required that if friable analysis, should either the P & CAM 239 supply of accredited persons might be ACM is removed it must be done using Method or NIOSH 7400 Method or both limited, use of a single firm might be specified work techniques. The be allowed in addition to the EPA/ necessary. The committee chose not to demolition requirement of NESHAP OSHA Reference Method? address this in the proposed rule, but requires removal of all affected friable thought further public comment would ACM regardless of its condition prior to E. Assessment demolition. Therefore, the central issue be helpful.
r The negotiating committee generally is not whether ACM shall be removed, !( agreed that assessment,.as provided in G. Response Actions but rather, when. EPA, however, wishes the proposed regulation, should be The negotiating committee spent a to avoid unnecessary removal and does flexible enough to accommodate a wide great deal of time composing definitions not wish to encourage schools to variety of acceptable and available of the various hazardous conditions. institute massive removal of asbestos methods and schemes. Prior to passage established by TSCA Title II and that is in good condition before of the TSCA Title II, the Agency began considering ways to ensure appropriate demolition. The EPA further recognizes the development of a new guidance response actions. EPA is directed by that ill-conceived or poorly conducted document on assessment which TSCA Title II to describe response . removal activities often create hazards included a decision tree for selecting actions “using the least burdensome for workers and building occupants far and ordering abatement activities. The methods which protect human health greater than those associated with decision tree was included in an initial and the environment.” This concept of leaving ACM in place. draft regulation, but was dropped due to "least burdensome methods. . . ." The remainder of this section deals committee sentiment that it was guided much of the committee’s with EPA’s reasons for choosing the inappropriate for the Agency to require deliberations and is basic to specific response action provisions in a single assessment method. understanding the proposed regulation’s j rule, discusses EPA’s Assessment was perceived as the means: descnption of response actions. . assessment of various technologies of collecting and considering whatever A ‘hou^ a^eement was not reached on decisionmaking data was necessary for the management all points. EPA believes the proposed - . p process regarding response actions and planner to make an informed,' regulation as a whole will protect explains EPA’s rationale for choosing responsible recommendation to the LEA human health and the environment. The proposed regulation is intended, operations and maintenance (O&M) consistent with response action requirements. whenever possible, to highlight factors provisions in the proposal. which the LEA must consider to 1. Response Actions F. Management Plans . determine the proper asbestos control Section 203 of AHERA includes strategies, including timing, for For most of the hazard situations specific provisions regarding appropriately and responsibly described in TSCA Title II, a step-wise information to be included by LEAs in addressing asbestos hazards in schools, ordering of considerations, based on their management plans, and section 205 given local circumstances. EPA intends using the “least burdensome 1 of AHERA provides a specific process to produce guidance to further elaborate methods. . . .’’ approach, is proposed. for State review of management plans. on factors which may be considered in EPA believes that this step-wise The language of the statute provided a selecting appropriate response actions. procedure allows the LEA to consider detailed framework for the proposed; A formal response action structure the full range of options available. This ■ rule. However, members of the was not generally endorsed by the. step-wise order of considerations, negotiating committee added negotiating committee. Instead, the however, should not be construed as " management plan provisions to the committee generally preferred to allow limiting LEA choice for selecting proposed rule to require that specific the LEA discretion within a range of removal as a response action, should items of information be included in the acceptable response action alternatives, removal be the preferred response plan for subjects not mentioned in the given the condition of the material, local action of the LEA. EPA’s reasons for statute, ensure that the plan be circumstances, technological feasibility choosing the specific response action available to interested parties at the of response actions, economic provisions in the proposed rule follow. administrative office of the LEA and the considerations, and other relevant Except for potential for damage and i' administrative office of the school, and factors. Reliance is placed upon potential for significant damage, the ! 1 V
I
NYC-WTC_000318765
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
27 shared non-person entities · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438164
EPA SOP excerpts and references for asbestos validation and inspections.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434667
Environmental protection document detailing Part 763 asbestos definitions and related sections.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452898
Chain-of-custody excerpt referencing Part 763 asbestos procedures and compliance.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445985
Chain-of-custody excerpt referencing Part 763 sections and regulatory definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442707
Pallet of Part 763 asbestos-related standard references and definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.971 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.966 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.964 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similar indexed content
NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
Similar indexed content
NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
Similar indexed content
NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
Similar indexed content
NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
Similar indexed content