0»l Federal Register / Vol. 52, No. 83 / Thursday, April 30, 1987 / Proposed Rules 15825
asbestos is present in any sample in a the plan to the State and at least once appropriate response action, the LEA concentration greater th^ 1 percent. each school year. may consider local circumstances.
i Compositing of samples (mixing several Proposed § 763.93 would require local including occupancy and use patterns samples together) is prohibited. LEAs to submit their management plans within the school building, and The 1982 EPA rule "Asbestos in to their States on or before October 12, economic concerns, such as short- and Schools: Identification and 1988. Each LEA must begin long-term costs. (3) When friable Notification", 40 CFR 763, Subpart F, implementation of its management plan surfacing or miscellaneous ACBM is 't. required analysis of bulk asbestos . on or before July 9,1989, and complete significantly damaged, the LEA must samples by PLM and provided a implementation of the plan in a timely immediately isolate the functional space protocol for analysis in its Appendix A. fashion. and then must remove the material in EPA proposes to require use of the same the functional space, unless enclosure or PLM method for this proposed rule. As it H. Response Actions . encapsulation would be sufficient to develops the accreditation process for The proposed rule identifies five contain fibers. laboratories performing analysis of bulk major response actions—operations and. For 4 and 5 above, response actions samples, NBS will consider whether to maintenance (O&M) in proposed for ACBM with potential for damage ’ change the PLM protocol. If NSS § 763.91 and in proposed § 763.90, repair, and potential for significant damage recommends changes, EPA will amend encapsulation, enclosure and removal— emphasize O&M and preventive this rule accordingly, and describes appropriate.conditions measures to eliminate the reasonable under which they may he selected by likelihood that damage will occur, (4) P. Assessment the LEA. The proposed rule also Proposed 5 763.88 outlines a general l<i„une.,he-«ep.wh,ch.h.nbe„ke„ assessment procedure to be conducted to properly conduct and complete the program. (5) If there is potential for by an accredited inspector during each response actions. significant damage and preventive inspection or reinspection. The inspector The LEA is required to select and measures cannot be effectively is required to classify ACBM and implement in a timely manner the implemented, response actions other suspected ACBM assumed to be ACM in appropriate response action. Local than O&M or area isolation may be the school building into broad categories education agencies are required to use appropriate for response actions. required. accredited persons to design or conduct Assessment may include a variety of response actions. Proposed § 783.90 Proposed § 763.91 would require the considerations, including the location specifically provides that nothing in the . LEA to implement an operations, and amount of material, its condition, proposed rule shall be construed to maintenance and repair (O&M) program . accessibility, potential for disturbance, prohibit the removal of ACBM from a for any school building in which friable known or suspected causes of damage, school building at any time, should ACBM is present or assumed to be or preventive measures v/hich might removal be the preferred response present in the building or about to eliminate the reasonable likelihood of action of the local education agency. become friable. The O&M program, damage. The LEA is directed to select Different response actions are which must be documented in the LEA . an accredited management plan required for each of the five major management plan, consists of worker developer who, after a review of the categories of damaged or potentially protection (summarized in Unit U.K. results of the inspection and the damaged ACBM. These categories are: below), worker training, periodic assessment, shall recommend in writing 1. Damaged or significantly damaged surveillance, cleaning, operations and maintenance activities (also in Unit
t appropriate response actions. C. Management Plans Proposed 5 763.93 requires LEAs to thermal system insulation ACM. 2. Damaged friable surfacing or miscellaneous ACM. 3. Significantly damaged friable ILK.), and fiber release episodes. The LEA shall ensure that all members of its maintenance and develop an asbestos management plan surfacing or miscellaneous ACM. custodial staff receive at least 2 hours of for each school under its administrative 4. Friable surfacing or miscellaneous awareness training. The LEA must also control or direction. The plan must be ACM, and thermal system insulation ensure that staff who conduct any developed by an accredited asbestos ACM which has potential for significant activities which will disturb ACBM management planner. Some of the major damage: and . receive an additional 14 hours of components required in the plan include; S. Friable surfacing or miscellaneous training. Specific topics to be covered in 1 A description of inspections and ACM, thermal system insulation ACM the 2-hour and 14-hour training courses response actions; an assurance that which has potential for damage. are listed. accredited persons were used to In each of the categories above, An initial cleaning is required, which conduct inspections, develop procedures for appropriately controlling employs wet methods and is conducted management plans, and design or or abating the hazards posed by the at least once after completion of the conduct response actions; and a plan for ACBM are set forth. (1) For damaged or inspection and before the initiation of a. reinspection and operations and significantly damaged thermal system response action other than an O&M maintenance. insulation, the LEA must at least repair activity. Each LEA is required.to maintain a the damaged area. If it is not feasible, Proposed § 763.91(d) would require copy of the management plan in its due to either technological factors or periodic surveillance to be performed at administrative office, and each school is economic considerations, to repair the least once every 6 months. The LEA may required to maintain a copy of its damaged material, it must be removed. use unaccredited personnel such as management plan in its administrative Further, the LEA must maintain all custodians or maintenance workers to office. These plans are to be made thermal system insulation in an intact conduct surveillance activities. Periodic available for inspection by the public state and undamaged condition. (2) If surveillance requires, checking known or without cost or restriction. LEAs must damaged friable surfacing or . . assumed ACBM to determine if the notify parent, teacher, and employee miscellaneous ACM is present, the LEA ADEM’S physical condition has changed organizations of the availability of shall encapsulate, enclose, remove, or since the last inspection or surveillance, management plans upon submission of repair the damaged area. In selecting the The date of the surveillance and any
NYC-WTC_000318761
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
27 shared non-person entities · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438164
EPA SOP excerpts and references for asbestos validation and inspections.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434667
Environmental protection document detailing Part 763 asbestos definitions and related sections.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452898
Chain-of-custody excerpt referencing Part 763 asbestos procedures and compliance.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445985
Chain-of-custody excerpt referencing Part 763 sections and regulatory definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442707
Pallet of Part 763 asbestos-related standard references and definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.971 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.970 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similarity score 0.963 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362205
SOP validation study references and definitions for asbestos Part 763 sections.
Similarity score 0.962 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similar indexed content
NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
Similar indexed content
NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
Similar indexed content
NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
Similar indexed content
NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
Similar indexed content