NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 77 pages

Background study draft for WTC asbestos, 2003

Machine-extracted title · confidence 37%

Background study draft on asbestos in schools related to WTC, March 2003.

NYC-WTC_000318678–000318754
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

41832 Federal Register / Vol. 52, No. 210 / Friday, October 30, 1987 / Rules and Regulations i C. Management Plans may select the response action that is actions other than O&M or area least burdensome. isolation may be required. Section 763.93 requires LEAs to LEAs are required to use accredited Section 763.91 requires the LEA to develop an asbestos management plan persons to design or conduct response implement an operations, maintenance for each school under its administrative actions. Section 763.90 specifically and repair (O&M) program for any control or direction. The plan must be provides that nothing in the rule shall be school building in which friable ACBM developed by an accredited asbestos construed to prohibit the removal of is present or assumed to be present in management planner. Some of the major ACBM frcjm a school building at any the building. Any material identified as components required in the plan include: time, should removal be the preferred nonfriable ACBM or nonfriable assumed A description of inspections and response action of the LEA. ACBM which is rendered or is about to response actions; an assurance that Different response actions are be rendered friable as a result of accredited persons were used to required for each of the five major activities performed in the school conduct inspections, develop categories of damaged or potentially building shall be treated as friable. For management plans, and design or damaged ACBM. These categories are: example, if nonfriable ACBM wallboard conduct response actions; and a plan for 1. Damaged or significantly damaged was about to be sanded, operations and reinspection, periodic surveillance, and thermal system insulation ACM. maintenance procedures would be operations and maintenance. 2. Damaged friable surfacing or required. The O&M program, which must Each LEA is required to maintain a miscellaneous ACM. be documented in the LEA management copy of the management plan in its 3. Significantly damaged friable plan, consists of worker protection administrative office, and each school is surfacing or miscellaneous ACM. (summarized in Unit U.K.), cleaning, required to maintain a copy of the 4. Friable surfacing or miscellaneous operations and maintenance activities school’s management plan in the ACM. and thermal system insulation (also in Unit ILK.), and fiber release school's administrative office. These ACM which has potential for .significant episodes. plans are to be made available for damage; and An initial cleaning is required, which inspection by the public without cost or 5. Friable surfacing or miscellaneous employs wet methods and is conducted restriction. LEAs must notify in writing. ACM. thermal system insulation ACM at least once after completion of the parent, teacher, and employee which has potential for damage. inspection and before the initiation of a organizations of the availability of In each of the categories above. response action other than an O&M management plans upon submission of procedures for appropriately controlling activity. In addition, the rule also . the plan to the Slate and at least once or abating the hazards posed by the requires that an accredited management each school year. The requirement for ACBM are set forth. For damaged or planner make a written recommendation written notification was added after the significantly damaged thermal system to the LEA regarding whether additional, Agency reviewed comments from the cleaning is needed. The insulation, the LEA must at least repair public. In addition, based on public recommendation on additional cleaning the damaged area. If it is not feasible. comments received on the proposed due to technological factors, to repair was added to the rule based on public rule, the Agency has included in the comments. the damaged material, it must be final rule a requirement that in the removed. Further, the LEA must The final rule requires that O&M absence of any such organizations, the maintain all thermal system insulation activities (other than small-scale, short- LEA shall provide written notice to that in an intact state and undamaged duration activities) which disturb group (e.g., parents) of the availability of condition. If damaged friable surfacing asbestos shall be designed and the management plan. or miscellaneous ACM is present, the conducted by persons accredited to do Section 763.93 requires LEAs to LEA shall encapsulate, enclose, remove. such work. (A discussion of what submit their management plans to their or repair the damaged area. After constitutes small-scale, short-duration States on or before October 12,1988. selecting the appropriate response projects is given in Appendix B to Each LEA must begin implementation of actions that protect human health and Subpart E.) Finally, procedures are its management plan on or before July 9, the environment, the LEA may consider provided for responding to fiber release 1989, and complete implementation of local circumstances, including episodes—the uncontrolled or the plan in a timely fashion. occupancy and use patterns within the unintentional disturbance of ACBM. For H. Hesponse Actions school building, and economic concerns, minor episodes (i.e., those involving 3 such as short- and long-term costs. square or linear feet or less of ACBM),. The final rule identifies five major When friable surfacing or miscellaneous basic cleaning and containment response actions—in § 763.91 operations ACBM is significantly damaged, the LEA practices for O&M staff are listed. For and maintenance (O&M) and in § 763.90, must immediately isolate the functional larger amounts, accredited personnel repair, encapsulation, enclosure and space and then must remove the are required to respond. removal—and describes appropriate material in the functional space, unless conditions under which they may be enclosure or encapsulation would be I. Training and Periodic Surveillance selected by the LEA. The final rule also sufficient to contain fibers. The LEA shall ensure that all identifies the steps which shall be taken Response actions for ACBM with members of its maintenance and to properly conduct and complete the potential for damage and potential for custodial staff receive at least 2 hours of response actions. significant damage emphasize O&M and awareness training. The I*EA must also The LEA is required to select and preventive measures to eliminate the ensure that staff who conduct any implement in a timely manner the reasonable likelihood that damage will activities which will disturb ACB.M appropriate response action. The occur. When potential damage is receive an additional 14 hours of response action selected shall be possible, the LEA must at least training. Specific topics to be covered in sufficient to protect human health and implement an O&M program. If there is the 2-hour and 14-hour training courses the environment. From among the potential for significant damage and are listed in § 763.92(a). response actions that protect human preventive measures cannot be Section 763.92(b) reqi .res periodic health and the environment, the LE.'K effectively implemented, response surveillance to be perl rmerl at least

NYC-WTC_000318685

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318685Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →